Skip to the record
Accept no substitutions.

Original source · versioned page text

Beach Road Retreats Stage 2 Conditions

Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).

of 19

Page text read automatically using OCR, there may be inaccuracies

132008.1779.1

 

52.

53.

54.

55.

56.

57.

58.

59.

Where a complaint (other than a frivolous or vexatious complaint) is made to the
Sunshine Coast Council about potable water quality at the development site, water
must be treated to a potable standard in accordance with the above condition and
analysed by an approved lab as directed by Sunshine Coast Council.

Waste storage and disposal facilities must be provided for the development in
accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings
and Commercial and Industrial Premises”, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A wash down area is required with a cold-
water tap, hose and drain outlet connected to septic system or approved absorption
trench. The drain outlet is to be designed to prevent stormwater entry to the absorption
trench.

Refuse containers must be provided for premises in accordance with the requirements
of the Environmental Protection (Waste Management) Regulation 2000, for the storage
and collection of refuse.

The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a
forward direction.

A Waste Management Plan (Operational) in accordance with the Noosa North Shore
Eco-Tourism Portal Development must be submitted for the day-to-day operations and
approved by Council’s Environment and Landscape Assessment Unit prior to issue of
development permit for operational works.

A Waste Management Plan (Demolition/Construction) in accordance with the Noosa
North Shore Eco-Tourism Portal Development Code shall be submitted for the
demolition and construction phases of the development and approved by Council's
Environment and Landscape Assessment Unit prior to the issue of the development
permit for operational works.

Noise emission from mechanical equipment (air conditioners, refrigeration equipment
or pool pumps etc) shall comply with the following requirements:

The equipment shall be enclosed, shielded and/or positioned in a manner that prevents
excessive noise as defined in Council’s Local Law No. 12 - Control of Nuisances.

A person must not use equipment on any day if it makes or causes noise to be made —

From 10pm to 7am: More than the lower of either —

° 40 dB(A)

° 3 dB(A) above the background noise level

° No audible noise for pool pumps apply during these hours.

From 7am to 7pm: More than the lower of either —

° 50 dB(A)

° 5 dB(A) above the background noise level

From 7pm to 10pm: More than 3 dB(A) above the background noise level.

Noise from building works associated with residential development shall comply with
the following —

9.1. Limited to between 7:00am to 5 :00pm Monday to Saturday.
9.2. All reasonable measures must be taken to minimise noise emissions.
9.3. Not permitted on Sunday or public holidays.

PD-DA-FM58/5-02/04/2009 Page 8 of 19

Log in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.