Original source · versioned page text
Beach Road Retreats Stage 2 Conditions
Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).
132008.1779.1 52. 53. 54. 55. 56. 57. 58. 59. Where a complaint (other than a frivolous or vexatious complaint) is made to the Sunshine Coast Council about potable water quality at the development site, water must be treated to a potable standard in accordance with the above condition and analysed by an approved lab as directed by Sunshine Coast Council. Waste storage and disposal facilities must be provided for the development in accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. A wash down area is required with a cold- water tap, hose and drain outlet connected to septic system or approved absorption trench. The drain outlet is to be designed to prevent stormwater entry to the absorption trench. Refuse containers must be provided for premises in accordance with the requirements of the Environmental Protection (Waste Management) Regulation 2000, for the storage and collection of refuse. The development must allow refuse-loading areas to be located off street. All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction. A Waste Management Plan (Operational) in accordance with the Noosa North Shore Eco-Tourism Portal Development must be submitted for the day-to-day operations and approved by Council’s Environment and Landscape Assessment Unit prior to issue of development permit for operational works. A Waste Management Plan (Demolition/Construction) in accordance with the Noosa North Shore Eco-Tourism Portal Development Code shall be submitted for the demolition and construction phases of the development and approved by Council's Environment and Landscape Assessment Unit prior to the issue of the development permit for operational works. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc) shall comply with the following requirements: The equipment shall be enclosed, shielded and/or positioned in a manner that prevents excessive noise as defined in Council’s Local Law No. 12 - Control of Nuisances. A person must not use equipment on any day if it makes or causes noise to be made — From 10pm to 7am: More than the lower of either — ° 40 dB(A) ° 3 dB(A) above the background noise level ° No audible noise for pool pumps apply during these hours. From 7am to 7pm: More than the lower of either — ° 50 dB(A) ° 5 dB(A) above the background noise level From 7pm to 10pm: More than 3 dB(A) above the background noise level. Noise from building works associated with residential development shall comply with the following — 9.1. Limited to between 7:00am to 5 :00pm Monday to Saturday. 9.2. All reasonable measures must be taken to minimise noise emissions. 9.3. Not permitted on Sunday or public holidays. PD-DA-FM58/5-02/04/2009 Page 8 of 19
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.