Skip to the record
Accept no substitutions.

Original source · versioned page text

Sealed Judgement

of 206

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 102, section 1. The text section number identifies this passage in the reader.

over the area that maintenance can be
reduced to a as needs basis.

Vegetation Management — Other areas

a)

The Concept Rehabilitation Plan
specifies the planting regime,
management and species pallet for
each rehabilitation zones within the
development areas.

Zone 1 is the area to rehabilitated as a
wetland to compliment the adjacent
wetland areas. This is considered to be
part of the existing vegetation
assemblage and as such will not result
in an increase in area of this relatively
small stand within the development site.
Zone 2 covers the area which will form a
vegetative screen between the southern
Eco-cabins and Noosa Drive. As this
area is too narrow and is separated
from any area of acknowledged bushfire
hazard to present a bushfire risk to the
development proposal.

Zone 3 covers the proposed detention
basin and the basin will be vegetated
with sedges and water tolerant grasses.
This is an artificial area and as such
regular maintenance will be required to
ensure weeds and other wetland
sedges such as Typha orientalis and
Phragmites australis do not gain a foot-
hold in the basin and increase the
average height of sedges within this
area.

Zone 5 — Balance area amongst cabins
area is to be in accordance with the
Concept Rehabilitation Plan (Gondwana
Ecology Group).

The Zone 5 area is to be managed on a
day-to-day basis by the RACV Noosa
Resort to maintain the plantings /
rehabilitation in a viable condition and to
ensure that no vegetation would
become a bushfire risk to any of the
Eco-cabins or boardwalk structures.

Emergency Response - Bushfire

a)

The current Emergency Response Plan
covering the RACV Noosa Resort is to
be updated to include the Eco-Cabins
and all existing actions and
responsibilities are to be adopted for the
Eco-cabins with respect to vegetation
and structural fires.

Building Compliance

a)

b)

Building Compliance under the National
Construction Code is to be conditioned
by the certified Building Certifier.

We note QFES will be required to
advise on fire hydrants and structural
fire mitigation issues for the proposed
Eco-cabin structures.

 

RFA18-048 — 22 - RACV Noosa Resort — Eco-Cabins - Bushfire Hazard Assessment and Mitigation Plan

Rob Friend & Associates Pty Ltd

28°" of May 2025
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.