Original PDF page 147, section 1. The text section number identifies this passage in the reader.

PROPOSED RACV NOOSA RESORT
142 NOOSA DRIVE, NOOSA HEADS                     ANDREW GOLD LANDSCAPE ARCHITECTURE

                                                 PO BOX 5220
                                                 MT GRAVATT EAST




   Rehabilitation Works Package
                                                 QLD 4122

                                                 T 07 3420 0006
                                                 M 0405 389 243
                                                 E [email protected]



             Prepared             GENERAL NOTES:

                                      1.    Read all landscape drawings and specifications and clarify
                                            any discrepancies with the Project Manager prior to
                                            undertaking works.
       By               For           2.    All work practices shall comply with the Occupational
                                            Health and Safety Act 2004 and all relevant regulations and
                                            codes of practice.

                                      3.    The location of the site compound and area for stockpiling
                                            of materials is to be agreed on site and authorized by the
                                            Project Manager prior to the commencement of works.

                                      4.    The site is to be secured for the full duration of works at the
                                            Contractor’s expense.

                                      5.    The Contractors must check all dimensions and levels on
                                            site. The proposed works must match into existing site
                                            levels where they interface with existing conditions.

                                      6.    The Contractor is to locate and confirm all existing services
                                            and service covers, whether shown on the drawing or not,
                                            prior to the commencement of works. The Contractor shall
                                            contact Dial Before You Dig to obtain any relevant service
                                            information prior to the commencement of works.

                                      7.    The Contractor is responsible for retaining, protecting and
                                            repairing any damage to all existing services, service
                                            covers etc. The Contractor shall advise the Project
                                            Manager of any required alternations.

                                      8.    Confirm all pit levels and resolve any discrepancies with the
                                            Project Manager prior to undertaking the works.

                                      9.    All levels are to be approved on site by the Project Manager
                                            at setout prior to undertaking the works.

                                      10.   All surface levels nominated on the plans are finished
                                            surface levels. The Contractor must include excavation,
                                            trimming and grading to appropriate sub-grade levels to
                                            achieve specified depth and adequate drainage of softfall
                                            mulch.




                                  I           27/05/25        RESUBMISSION TO COURT
                                  H           22/05/25        AMENDMENTS AS REQUIRED
                                  G           09/09/24        SUBMISSION TO COURT
                                  F           06/09/24        AMENDMENTS AS REQUIRED
                                  E           05/09/24        AMENDMENTS AS REQUIRED
                                  D           04/09/24        AMENDMENTS AS REQUIRED
                                  C           02/09/24        AMENDMENTS AS REQUIRED
                                  B           02/09/24        FOR REVIEW
                                  A           29/08/24        DRAFT FOR REVIEW

                                  ISSUE       DATE            REASON

                                  THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
                                  AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
                                  INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
                                  INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
                                  RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
                                  ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
                                  DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
                                  INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
                                  DIMENSIONS ARE TO BE VERIFIED ON SITE.




                                  PROPOSED RACV NOOSA RESORT
                                  142 NOOSA DRIVE, NOOSA HEADS

                                  COVER SHEET

                                  JOB No.         DWG No.         ISSUE       DRAWN BY          CHECKED BY
                                  24.160         000               I          CP / HF           AG

                                  NOT FOR CONSTRUCTION



                                                                                             145
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.