Skip to the record
Every meeting, every word.

Original source · versioned page text

Sealed Judgement

of 206

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 148, section 1. The text section number identifies this passage in the reader.

MONITORING & MAINTENANCE SCHEDULE
                                                                                                                                                  REHABILITATION MANAGEMENT PLAN NOTES                                                           FIRE ANT MOVEMENT CONTROLS                                                                          REHABILITATION TIMEFRAMES AND SUCCESS CRITERIA TABLE
TIMING              TASK                                             REMEDIAL ACTION                                RESPONSIBILITY

Pre-planting        • At least 1 round of weed pre-treatment;        • Ensure initial weed treatment rounds         Project Ecologist and         ECOLOGICAL RESTORATION AND RECONSTRUCTION GOALS                                                To prevent the spread of fire ants, the Queensland Government has implemented controls               PHASE             ACTION                                           TIMEFRAME                                      APPLICABLE ZONES
                    • Confirm that appropriate pest plant              are completed ;                              Rehabilitation Contractor                                                                                                    that apply to individuals and commercial operators, to restrict the movement of materials
                      control has been completed as guided           • Evaluate success of initial weed                                           The Primary Objectives and Performance Criteria is to:                                         that could carry fire ants including soil, turf, potted plants, mulch, baled hay or straw, animal    Establishment
                      by the State and Council Restricted              treatment;
                      Invasive Pest Plant Table.                     • Instigate an additional round of
                                                                                                                                                  a) Create a natural and sustainable environment amongst the eco-cabins and enhance             manures mining or quarry products.                                                                  1                  Initial inspection of the Rehabilitation Area    Prior or during OPW.                           All Rehabilitation Zones
                                                                                                                                                      surrounding ecological values.                                                                                                                                                                                    by the rehabilitation contractor (pre-start).
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ANDREW GOLD LANDSCAPE ARCHITECTURE
                                                                       treatment if success rate is low.
                                                                                                                                                  b) Enhance ecological values and retain/protect where values exist.                            All rehabilitation contractors engaged to work on this project must have a relevant                                    Detail the extent of weeding works
                                                                                                                                                                                                                                                                                                                                                                        required, areas requiring planting and                                                                                                    PO BOX 5220
                    • Apply mulch as specified                       • Reapply mulch where required.                                              c) Remove/control the invasive Frangipani vine (and other invasive species) {refer             Approved Risk Management Plan (ARMP). Note: all vegetation or soil moved off-site must
                                                                                                                                                                                                                                                                                                                                                                        areas supporting existing native                                                                                                          MT GRAVATT EAST
                                                                                                                                                      Native Foresters 2024 - Weed Management Plan}.                                             be conducted under an ARMP. It is the contractor’s responsibility to conduct all activities in                         vegetation. This is to be reflected in the                                                                                                QLD 4122
                    • Acquire fertilizer and sun-hardened            • Delay planting until all materials are
                      seedlings.                                       available.
                                                                                                                                                  d) Retain native canopy species that have retention (i.e. good condition and health) and       accord with their ARMP as penalties apply for non-compliance with the movement controls.                               costing and planting levels based on the
                                                                                                                                                      ecological (e.g. koala and bird habitat) value.                                            The engaged contractors are unsure of their obligations they should contact Biosecurity                                temporal period of survey.                                                                                                                T 07 3420 0006
                    • Install exclusion signing and/or fencing       • Delay planting until all materials are                                     e) Establish a native ground and midstorey (noting this is currently non-existent).            Queensland.                                                                                                                                                                                                                                                      M 0405 389 243
                      to prevent disturbance from vehicles,            available.                                                                                                                                                                                                                                                                     2                 Rehabilitation Zones area pegging                Prior or during OPW.                                                                     E [email protected]
                                                                                                                                                  f) Plant-out the various rehabilitation zones with suitable native species.                                                                                                                                           established around the perimeter to flag
                      livestock and/or otherwise.
                                                                                                                                                  g) Embellish a buffer/screen to the road with the use of suitable native species.              WEEDS                                                                                                                  the extent of works.
During Planting     • Any necessary follow-up weed control.          • Ensure all works are completed               Project Ecologist and         h) Create habitat and resources that currently do not exist (including installation of nest
                                                                                                                                                                                                                                                 Prominent and problematic weeds are noted on the Weed Management Plan by Native                      3                 Initial Weed Treatment and Planting as           On-maintenance inspection with Council         All Rehabilitation Zones
                                                                                                                    Rehabilitation Contractor         boxes and salvaging of any hollow logs).
                    • Initial planting and watering and              • Ensure all works are completed                                                                                                                                                                                                                                                                   appropriate for the identified management        Ecologist is to occur at practical
                                                                                                                                                  i) Facilitate fauna movement through the site with spaces between cabins, a raised             Foresters, specifically Frangipani vines, Umbrella trees, Cocos palm, Mother of millions and                           units.                                           completion of works.
                      installation of tree guards.                                                                                                                                                                                               Creeping inch plant. The Rehabilitation Contractor is required to inspect the site and inform
                                                                                                                                                     construction and dense native plantings.                                                                                                                                                                           Active weed management following plant
                                                                                                                                                  j) Enhance and facilitate safe koala passage through and surrounding the site                  themselves of the extent of any types of weeds present on the site prior to tendering.                                 establishment and encouragement of
3 Month             • At the minimum, water newly installed          • Replace damaged seedlings and stake          Rehabilitation Contractor
                                                                                                                                                      (including the State-approved road signage, clearing of the vine)                                                                                                                                                 native regeneration (preferably over
Establishment         seedlings three times a week for the             weak or leaning plants
                                                                                                                                                                                                                                                 WEEDS AND HERBICIDE USE                                                                                                growing seasons being spring, summer
Period                remainder of the first month after                                                                                          k) Contribute to the conservation and protection of the open space land to the west
                                                                                                                                                                                                                                                                                                                                                                        and autumn). Weed densities are
                      planting.                                                                                                                       (and broader locality) through on site weed management and rehabilitation with                                                                                                                                    not to exceed 25% coverage at the time of
                                                                                                                                                      native species.                                                                            Within the proposed rehabilitation area, weeds of concern; declared weeds and weeds of                                 on-maintenance inspection unless agreed
                    • Water newly installed seedlings TWICE          • Additional watering may be required
                                                                                                                                                  l) Routinely monitor and maintain (with onsite resources) the applicable rehabilitation        concern and other environmental weeds must be treated in accordance with the control                                   to in writing by Council-appointed
                      EACH WEEK during Month 2 after                   during dry periods
                                                                                                                                                      zones to identify and rectify where necessary:                                             methods provided in: Weed Management Plan by Native Foresters unless it can be                                         Ecologist.
                      planting or as required.
                                                                                                                                                            • Litter and/or rubbish dumping                                                      demonstrated that there is an overriding need to utilise another method which deviates from          On-Maintenance
                    • Check exclusion signage is still in place      • Reinstate or upgrade exclusion signage                                               • Plant replacement                                                                  the below methods. It is noted that not all weeds are or will be present during works;
                      and performing its role.                         if required.                                                                                                                                                                                                                                                                                     Assessments to be undertaken in line with        6-monthly progress reports to be submitted     All Rehabilitation Zones
                                                                                                                                                            • Fauna impacts                                                                      however, may occur over time. The engaged restoration contractor must undertake detailed
                                                                                                                                                                                                                                                                                                                                                                        success criteria for the abundance of            to Council Ecologist during the
                                                                                                                                                            • Erosion                                                                            site inspections prior to works commencing to identify target weed species, their location                             weeds, and regeneration review of all            implementation and 24 month maintenance
                    • Check for disturbances from pests (e.g.,       • Replace damaged seedlings if browsing
                      hares, foxes, etc.) or vandals.                  is observed                                                                          • Overgrowth                                                                         and the extent of treatment. Target weeds identified on-site and their control method are                              rehabilitation weeding.                          period must include:
                                                                                                                                                                                                                                                 outlined in Weed Management Plan techniques and herbicide application rates.                                           All plantings that don’t strike, are killed or   • Progress on implementation and any
                    • Check for signs of soil erosion and            • Implement erosion and sediment control                                                                                                                                    Appropriately qualified/supervised persons must apply herbicides in accordance with the                                damaged must be replaced during this                changes to the schedule;
                                                                                                                                                  PROCESS
                      instability.                                     i.e., jute matting and sediment fencing in                                                                                                                                                                                                                                                       period.                                          • Photomonitoring (photos facing north,
                                                                                                                                                                                                                                                 Agricultural Chemicals and Distribution Control Act 1966 at rates identified on registered                                                                                 south, east and west at each
                                                                       areas suffering erosion.
                                                                                                                                                  Proposed Site Works (to be confirmed/finalised immediately following approval)                 product labels, or on an Australian Pesticides and Veterinary Medicines Authority (APVMA)                                                                                  photo-point);
                    • Assess maintenance of understory in            • Mow or slash where required                                                                                                                                               issued off-label permit where applicable. Refer to the South-East Queensland Ecological                                                                                 • Notes on success of plantings, including
                      relevant zones, which must be kept in a                                                                                       1.    Identify the overall site boundaries / periphery and clearly demarcate with suitable   Restoration Framework for additional guidance.                                                                                                                             indicators of growth, health and survival
                      low fuel state.                                                                                                                                                                                                                                                                                                                                                                                       of all plantings;
                                                                                                                                                         notices/flagging and install site-safe fencing where appropriate.
                                                                                                                                                                                                                                                                                                                                                                                                                         • Notes on weeds including presence of
                                                                                                                                                    2. Identification of individual trees for removal vs retention.                              SPECIFICATION NOTES FOR PLANTING                                                                                                                                           weeds and success of weed control
Month 1 -6       • Monitor rehabilitation progress and               • Replace damaged seedlings and stake          Rehabilitation Contractor
(On Maintenance)   seedling health.                                    weak or leaning plants. Water as
                                                                                                                                                    3. Initial weed control (refer WMP 2024) as soon as approval (2 months) – entire site.                                                                                                                                                                                  measures;
                                                                       required.                                                                    4. Fauna spotter work and reporting (simultaneously with weed control).                       1.     It is the responsibility of the engaged contractor to determine the final location of                                                                           • Evidence of erosion and success of
At least Monthly                                                                                                                                    5. Follow-up inspection (arborist) of tree health post initial vine control exercise.                each planting. This location should take into account the position of any existing                                                                                 erosion control measures (e.g.
(or as conditions   • Check for disturbances from pests (e.g.,       • Replace dead seedlings.                                                                                                                                                           vegetation retained within the Site and the necessary maintenance of the                                                                                           jutematting) that have been
                                                                                                                                                    6. Individual tree removal (with fauna spotter).
dictate)              rabbits, foxes, etc.) or vandals.                                                                                                                                                                                                                                                                                                                                                                     implemented;
                                                                                                                                                    7. Tree remediation under the direction of the arborist – retained trees’ canopy                     Rehabilitation Zones.                                                                                                                                           • Progress of ongoing site management
                                                                                                                                                     modification and pruning to promote tree health/survival.                                     2.    Ensure all water crystals are thoroughly wetted before application and fertiliser is                                                                               issues (e,g. works implemented
                    • Check for signs of soil erosion and            • Implement additional erosion and
                      instability.                                     sediment control i.e., jute matting and                                      8. Determination of ‘construction corridors’ – work access zones.                                    applied at the nominated rate.                                                                                                                                     as a result of prior corrective actions);
                                                                       sediment fencing in areas suffering                                          9. Install the balance of the vegetation protection regime, including fencing to               3.    Planting Treatments: remove all weeds and install planting as noted. Provide a                                                                                     and
                                                                       erosion.                                                                                                                                                                          bamboo marker at each tube stock location that extends 300mm above the ground                                                                                   • Any recommendations regarding the
                                                                                                                                                     demarcate work areas/exclusion zones and individual tree protection (e.g.
                                                                                                                                                                                                                                                                                                                                                                                                                            ongoing management of the site
                                                                                                                                                     walkways/workways and around cabin footprints).                                                     and has the top 100mm painted white or pink – Per Tubestock Planting detail 3.
                    • Monitor restricted invasive plants and         • Treat invasive species to prevent their
                                                                                                                                                    10. Continue weed management throughout rehabilitation zones and initiate planting             4.    Ensure all water crystals are thoroughly wetted before application and fertiliser is         Off-Maintenance
                      weeds.                                           spread.
                                                                                                                                                     progressively as areas become available for planting.                                               applied at the nominated rate.
                                                                                                                                                                                                                                                                                                                                                                        The following success criteria must be met       Minimum 24 months after On Maintenance         All Rehabilitation Zones
Month 6 – 11        • Check for erosion and sediment run-off.        • Implement additional erosion and             Rehabilitation Contractor                                                                                                      5.    Install aged forest mulch circles around each plant to a depth of 100 mm                                       to achieve offmaintenance:                       is achieved.
                                                                       sedimentation control i.e., jute matting,    (weed monitoring & control)   NOTE: All initial site work (e.g. fencing, tree identification, clearing, management) to be            throughout the areas indicated to be planted in the Rehabilitation Zones in                                    • WoNS, weed species listed under the
At least Monthly                                                       or jute netting and mulch.                                                                                                                                                        accordance with Detail 1.
(or as conditions
                                                                                                                                                  completed in the presence of the Project Arborist and the Project Ecologist.                                                                                                                                             Biosecurity Act 2014 are not to be
dictate)
                                                                                                                                                                                                                                                   6.    Install tree guards (bags or core flute) on all planted trees.                                                    present in Rehabilitation Zones;
                    • Monitor restricted invasive plants and         • Treat restricted invasive pest plant                                                                                                                                                                                                                                                             • Evidence of significant reductions in the
                      weeds.                                           species and spray/remove to prevent                                        CONTRACTOR QUALIFICATIONS                                                                                                                                                                                                presence of other exotic species. It is
                                                                       their spread.                                                                                                                                                                                                                                                                                       noted that the removal of all individual
                                                                                                                                                  The appointed Rehabilitation Contractor is responsible for ensuring the implementation and     The rehabilitation and weed management strategy, planting species and densities may                                       exotic species is likely to be
                    • Monitor and record rehabilitation              • Additional watering when rainfall is low;                                                                                                                                 need to be amended over time in response to the impact associated with the
                                                                                                                                                  compliance with this Rehabilitation Plan. The appointed contractor must be suitably                                                                                                                                      unachievable and not practical. Further,
                      progress and seedling health.                    and
                                                                                                                                                  qualified in bushland rehabilitation and be able to demonstrate bushland regeneration          Frangipani Vine.                                                                                                          the timing of this RMP may not reflect
                                                                     • Replace damaged or dead seedlings                                                                                                                                                                                                                                                                   the abundance or density of weed
                                                                       and replenish mulch where required.                                        experience. All rehabilitation personnel must hold a minimum Certification III in
                                                                                                                                                                                                                                                                                                                                                                           species at the commencement of works.
                                                                                                                                                  Conservation Land Management, Certificate III in Horticulture, Certificate III in              MULCH
                                                                                                                                                                                                                                                                                                                                                                           The engaged contractor must establish
                    • Assess maintenance of understory in            • Mow or slash where required.                                               Rehabilitation Construction or equivalent experience in bush regeneration and                                                                                                                                            a starting density and abundance of
                      relevant zones, which must be kept in a                                                                                                                                                                                    Used Aged Forest Mulch to a depth of 100mm
                      low fuel state.
                                                                                                                                                  rehabilitation. Further, the supervising officer for the engaged rehabilitation contracting                                                                                                                              weeds at the time of initial inspection
                                                                                                                                                  team must hold a minimum Bachelor’s Degree in Environmental Science or similar. Further,                                                                                                                                 and no more than 10% coverage is
                                                                                                                                                                                                                                                 ON MAINTENANCE                                                                                                            required by time of off-maintenance
Month 12            • Check for erosion and sediment run-off.        • Implement additional erosion and             Rehabilitation Contractor     all chemical weed treatment works must be undertaken under a current Ground Distribution                                                                                                                                 inspection.
                                                                       sedimentation control i.e., jute matting,    (weed monitoring & control)   Contractors Licence and Agricultural Chemical Distribution Certificate (ACDC).
                                                                       or jute netting and mulch.                                                                                                                                                LANDSCAPE AND PLANTING SPECIFICATIONS MAINTENANCE                                                                      • Rehabilitation Zones planted out               2 years.                                       All Rehabilitation Zones
                                                                                                                                                  SITE PREPARATION                                                                                                                                                                                                        according to species and densities
                    • Monitor for restricted invasive pest plant     • Treat restricted invasive pest plant                                                                                                                                      The minimum following maintenance measures are required to be undertaken by the                                          specified in the Planting Schedule as
                      species and other weeds, record                  species and spray/remove to prevent                                                                                                                                                                                                                                                                appropriate for the identified
                      progress and ongoing issues                      their spread.                                                              The Contractor shall be responsible for the identification and removal of all deleterious      engaged Rehabilitation Contractor:
                                                                                                                                                                                                                                                                                                                                                                          management unit; and
                                                                                                                                                  material, redundant structure etc. that is inconsistent with the objectives for natural area   • Planting areas are to be regularly watered for a period of 12 weeks or as deemed                                     • All plantings must have been
                    • Monitor and record rehabilitation              • Additional watering when rainfall is low;                                  management. The Rehabilitation Contractor will be responsible for making themselves              necessary by the contractor to ensure the establishment is successful or until sufficient                              established and likely to persist without
                      progress and seedling health                     and                                                                                                                                                                         rainfall is received or plants have been established sufficiently.                                                     assistance going forward.
                                                                                                                                                  aware of the location and removal of such materials.
                                                                     • Replace damaged or dead seedlings                                                                                                                                         • Recurrent listed WoNS or Biosecurity Act 2014 weeds within regeneration areas are to
                                                                       and replenish mulch where required.
                                                                                                                                                  SERVICES                                                                                         be removed
                                                                                                                                                                                                                                                 • Hollow-bearing limbs and suitable hollow logs removed during operational works should             CORRECTIVE ACTIONS
                    • Review the first 12 months of the              • Report rehabilitation progress results to
                      monitoring schedule and assess                   landowner                                                                  The contractor shall make themselves aware of all underground and overhead services              be salvaged and relocated into the areas to be rehabilitated to enhance the microhabitats
                      effectiveness of Rehabilitation Plan.                                                                                                                                                                                        available within the overall Rehabilitation Zones.                                                The following corrective actions are to be implemented in instances of non-compliance with
                                                                                                                                                  prior to the commencement of works. The contractor shall also be responsible for                                                                                                                   the Goals and Success Criteria:
                    • Assess maintenance of understory in            • Mow or slash where required.                                               determining the locations of built and to-be-constructed services during the course of the
                      relevant zones which must be kept in a                                                                                      works. Services have been identified on the plans.                                             The rehabilitation areas will require a minimum of 6 monitoring point to be established. It is                                                                                                                                                    I           27/05/25        RESUBMISSION TO COURT
                                                                                                                                                                                                                                                 important to monitor the restoration progress by collecting a range of data to illustrate the       • If retained trees show signs of ill health (i.e. dead or poor health), an arborist (minimum                                                 H           22/05/25        AMENDMENTS AS REQUIRED
                      low fuel state.
                                                                                                                                                                                                                                                 achievement of the success criteria.                                                                  qualification AQF Level 5) is to be engaged to identify the likely causes and to                                                            G           09/09/24        SUBMISSION TO COURT
                                                                                                                                                  REHABILITATION ZONE RESTRICTIONS                                                                                                                                                                     recommend mitigation measures to improve regeneration conditions.                                                                           F           06/09/24        AMENDMENTS AS REQUIRED
                    • First year report to be submitted to Council                                                  Project Ecologist
                                                                                                                                                                                                                                                                                                                                                     • Where weed re-establishment occurs, additional treatment and removal works are to be                                                        E           05/09/24        AMENDMENTS AS REQUIRED
Month 13-23         • Check for erosion and sediment run-off.        • Implement additional erosion and             Rehabilitation Contractor     The following restrictions on the Rehabilitation Zones (Zones 1-5) area shall be               Monitoring must be undertaken at 3-month intervals and be documented. Upon the                                                                                                                                                                    D           04/09/24        AMENDMENTS AS REQUIRED
                                                                                                                                                                                                                                                 completion of the works program (2 years), the monitoring efforts are to be compiled and              instigated; if evidence of excessive spraying exists or if off-target damage is evident,
                                                                       sedimentation control i.e., jute matting,    (weed monitoring & control)   implemented:                                                                                                                                                                                                                                                                                                                                     C           02/09/24        AMENDMENTS AS REQUIRED
At least every                                                                                                                                                                                                                                   submitted to Council. It is the responsibility of the Rehabilitation Contractor to actively           further restoration will be required to the satisfaction of the assessment manager.                                                         B           02/09/24        FOR REVIEW
                                                                       or jute netting and mulch.
second month (or                                                                                                                                                                                                                                 undertake monitoring and achieve the monthly records. Data that should be collected                 • Where planted specimens within the establishment and monitoring period fail to strike,                                                      A           29/08/24        DRAFT FOR REVIEW
                                                                                                                                                  • No parking or movement of construction machinery and vehicles.                                                                                                                                     supplementary planting is to be undertaken.
as conditions    • Monitor for restricted invasive pest              • Treat restricted invasive pest plant                                                                                                                                      includes:
dictate)           plants and other weeds, record progress             species and spray/remove to prevent                                        • No placement of site offices, storage sheds, portaloos, and other permanent or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   ISSUE       DATE            REASON
                   and ongoing issues;                                 their spread.                                                                temporary structures.
                                                                                                                                                  • No storage of topsoil, building materials, fuels and other chemicals.                        • The average height of RMP planted plants within the Management Unit (height in meters
                    • Monitor and record rehabilitation              • Additional watering when rainfall is low;                                  • No dumping of excess materials and / or wastes.                                                for tree, shrub and groundcover species);                                                                                                                                                                                                       THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
                      progress and seedling health.                    and
                                                                                                                                                  • No storage of dangerous goods or hazardous materials, washing off vehicles and               • Dominant species (qualitative description of the dominant species in each strata)                                                                                                                                                               INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
                                                                     • Replace damaged or dead seedlings                                                                                                                                         • Assessment of the health of vegetation within the restoration area                                                                                                                                                                              INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
                                                                       and replenish mulch where required.                                          construction machinery or disposal of cleaning products is to occur within the                                                                                                                                                                                                                                                                 RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
                                                                                                                                                    construction zone.                                                                           • Percentage of weed cover within the restoration area                                                                                                                                                                                            ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE

                    • Assess maintenance of understory in            • Mow or slash where required.                                               • No general foot access of construction staff unless specifically related to                  • Survival percentage of planted specimens                                                                                                                                                                                                        DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
                      relevant zones, which must be kept in a                                                                                       restoration/rehabilitation of areas to be protected and rehabilitated                        • Notation of natural death or illegal removal of any native plants                                                                                                                                                                               DIMENSIONS ARE TO BE VERIFIED ON SITE.
                      low fuel state.                                                                                                                                                                                                            • Abundance of natural recruitment including native and exotic species.
Month 24            • Check for erosion and sediment run-off.        • Implement additional erosion and             Rehabilitation Contractor     EROSION AND SEDIMENT CONTROLS
                                                                       sedimentation control i.e., jute matting,    (weed monitoring & control)                                                                                                  Photographs shall be taken in cardinal directions at each monitoring site which is to consist
                                                                       or jute netting and mulch.                                                 Earthworks undertaken as part of the civil works of the proposed development will involve      of a 10 x 10m plot. The plot should be marked with star pickets or flagging tape to allow for
                                                                                                                                                  the establishment of erosion and sediment fencing. However, it is recommended that the         ease of identification in the field. All works and chemicals used should be logged and
                    • Monitor for restricted invasive pest plant     • Treat restricted invasive pest plant                                                                                                                                      documented as part of the Monitoring Program. The restoration contractor should develop a
                      species and other weeds, record                  species and spray/remove to prevent                                        contractors consider the establishment of their own erosion and sediment fencing if
                      progress and ongoing issues                      their spread.                                                              required.                                                                                      pro forma for the collection of relevant monitoring information during all events to ensure
                                                                                                                                                                                                                                                 consistency and comparability between surveys.
                    • Monitor and record rehabilitation              • Additional watering when rainfall is low;                                  SITE CLEAN-UP & WASTE MANAGEMENT                                                               Where actions are required to address instances of non-compliance or plant failure,                                                                                                                                                               PROPOSED RACV NOOSA RESORT
                      progress and seedling health                     and
                                                                     • Replace damaged or dead seedlings
                                                                                                                                                                                                                                                 corrective actions are to be implemented by the rehabilitation contractor. Any major
                                                                                                                                                                                                                                                 non-compliance with this approved plan must be agreed to by Council Ecologist. Refer to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   142 NOOSA DRIVE, NOOSA HEADS
                                                                       and replenish mulch where required.                                        Hazards and wastes are removed from the development site; this includes:
                                                                                                                                                                                                                                                 the Corrective Actions detailed in the Landscape and Planting Specifications below:
                    • Review months 12-24 of the monitoring
                      schedule and assess effectiveness of
                                                                     • Report rehabilitation progress results to
                                                                       landowner
                                                                                                                                                  • Any wastes as defined in the Environmental Protection Act 1994.
                                                                                                                                                  • Machinery, fencing or equipment left over from past uses and practices.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   REHABILITATION NOTES
                      Rehabilitation Plan.
                                                                                                                                                  • Items of rubbish and litter.
                    • Assess maintenance of understory in            • Mow or slash where required.
                      relevant zones, which must be kept in a                                                                                     It is noted that site surveys did not identify any significant waste material.                                                                                                                                                                                                                                                                   JOB No.        DWG No.          ISSUE       DRAWN BY          CHECKED BY
                      low fuel state.
                    • First year report to be submitted to Council
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   24.160         001               I          CP / HF           AG
                                                                                                                    Project Ecologist

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   NOT FOR CONSTRUCTION



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              146
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.