5                 Conclusion
It is proposed to extend the RACV Noosa Resort to construct Eco-Cabins for short-term
accommodation. The proposed development will consist of eight (8) Cabins and associated
suspended walkways and car parks.

Water Engineering Partners completed a Site Based Stormwater Management Plan to:
    x    confirm that development could occur without an increase in the peak flow discharged from
         the site to Weyba Creek; and
    x    demonstrate that the quality of stormwater discharged from the site meets best practice
         quality objectives.

The results of the detailed hydrologic and stormwater quality modelling undertaken in support of the
development can be summarised below.

x       Stormwater Quantity

        The stormwater quantity management strategy consists of the following measures:

        o   A tank located under the carpark with a volume of 60 m3; and
        o   3 kL of the rainwater tank at each Cabin allocated for stormwater peak flow attenuation.

        Hydrologic modelling demonstrated that the post-development peak flows from the Site will be
        greater than those of the pre-development flow rates.

x       Stormwater Quality

        The stormwater quality management strategy consists of the following measures:

        o   A bioretention basin with a filter area of 50 m2; and
        o   5 kL of the rainwater tank at each Cabin allocated for the capture and storage of runoff for
            internal use.

        In addition to the above rainwater tank volume, a volume of 2 kL was allowed for the storage of
        trickle top-up flows from the mains system. This provides a nominal rainwater tank volume of
        10 kL (i.e., 2 kL top up water, 5 kL for collection of roofwater runoff for reuse, and 3 kL for
        detention storage).

        Stormwater quality modelling demonstrated that the proposed treatment measures will meet
        best practice stormwater quality objectives relevant to the site.




                                                                               R.30199.001.03_SMP.docx | 24




                                                                                                              174
Log in to download the original file

Sealed Judgement.pdf · 118 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.