Original source · versioned page text
Sealed Judgement
Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
Community Management Statement
16. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
17. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice and, in particular, must include the
following additional clause:
“The units must be used for short term accommodation for tourists and travellers
only.”
Public Safety
18. During operating hours, all parking areas, pedestrian areas and entrances/exits to all
stairwells, lifts, foyers and public toilets must be well lit with vandal resistant lighting and
with intensities to satisfy the requirements of Australian Standard AS1158 “Public
Lighting Code”. Lighting must be designed to reduce the contrast between shadows and
well-lit areas. In particular, appropriate security lighting must be provided in the location
of the bicycle/ scooter parking and bin storage area.
Street Identification
19. The building entrance or reception area must be clearly visible and identifiable from the
street or otherwise provided with signage and lighting at strategic locations to direct
people to the building entrance.
Performance Bonds
20. Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Lot Amalgamation
21. Lot 3 on SP126203 and Lot 203 on SP267424 shall be amalgamated into one undivided
allotment in accordance with the Plan of Survey submitted for registration at the Land
Titles Office. Proof of title being issued for the amalgamated lot shall be submitted to
Council prior to the commencement of use.
Note: as a consequence of the amalgamation any access easement over Lot 3 on
SP126203 in favour of Lot 203 on SP267424 may need to be extinguished.
ENGINEERING
Site Access and Driveways
22. A sealed access driveway must be provided from the existing internal resort access road
to all parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. a driveway that is minimum width of 5.5m or a width that is sufficient to permit
vehicles travelling in opposite directions to pass
8274014_1
3459-9154-4892, v. 1
8309250_1
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.