b. suitable safety measures at the intersection with the internal resort access road
(signage, line marking etc), to improve driver awareness of the intersection and
adjacent carparking area.
Car Parking
23. A minimum of 18 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular,
24. 1 disabled parking space within the total dimensions, crossfalls and gradients in
accordance with Australian Standard AS/NZS2890.1:2004 Parking Facilities.
25. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
26. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Service Vehicles
27. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. 1 van space; and
b. occasional access for an MRV.
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. A lawful point of discharge is deemed to have been provided if the
discharge from the site is in accordance with the Water Engineering Partners (WEP)
Site-Based Stormwater Management Plan dated 23 May 2025 and complies with the
remainder of this condition and condition 29. The works must be undertaken in
accordance with an Operational Works approval and be generally in accordance with
the Stormwater Management Joint Experts Report dated 19 July 2024, and the Water
Engineering Partners (WEP) Site-Based Stormwater Management Plan dated 23 May
2025.
Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
29. Stormwater runoff from the development must be disposed of without causing scour or
damage to the subject site or any adjoining property.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third-
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
8274014_1
3459-9154-4892, v. 1
8309250_1
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.