Engineering Hydrology Plans (IWMP)

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 3.4    Mitigated Scenario
 When comparing the peak flows in the existing and developed scenario, increases in
 the peak discharge occur at Outlets 2 and 3. As a result a detention system will be
 required to be implemented in order to demonstrate non-worsening from the site.

 All modeling parameters remain consistent between the developed and mitigated
 scenarios, with the addition of a detention system within sub-catchments C and D.
 Due to site constraints the detention system has been modeled as a
 square/rectangular underground detention system. The storage details included
 within the model are provided in Table 18.

 Table 18: Storage and Outlet Details of Detention System

Sub-Catchment       Storage       Storage Height       Outlet Pipe
                                                                         Peak 100yr WSL (m)
   Location       Volume (m3)          (m)           Diameter (mm)
    SUBC              100              1.0                375                   0.87
    SUBD              100               1.0                 250                 0.99



 A comparison of the peak flows between the existing, developed and mitigated
 scenarios are presented below in Table 19. It can be seen that non-worsening of
 peak flows are achieved at each outlet to the site.

 Table 19: Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows


                  Existing Peak     Developed Peak      Mitigated Peak
                                                                              Reduction
                   Flow (m3/s)        Flow (m3/s)        Flow (m3/s)
Outlet 1
       2               0.73               0.69                0.69              -0.04
      10               1.02               0.95                0.95              -0.07
     100               1.40               1.31                1.31              -0.09
Outlet 2
       2               0.14               0.19                0.14              0.00
      10               0.19               0.26                0.19              0.00
     100               0.26               0.35                0.25              -0.02
Outlet 3
       2               0.07               0.13                0.07              0.00
      10               0.10               0.18                0.10              -0.01
     100               0.14               0.25                0.13              -0.01




                                                                                          20
Log in to download the original file

Engineering Hydrology Plans (IWMP).pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.