Engineering Hydrology Plans (IWMP)

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Executive Summary
AquaIntel Pty Ltd was commissioned by TOD Consulting Engineers to prepare an Integrated
Water Management Plan (IWMP) for the proposed development of a tavern, bottle shop,
residential, commercial and specialty shop site as part of Noosa Fair at Noosa Junction.

The site is currently fully developed and operates as the Noosa Bowls Club. The site itself
consists of the club house and three bowling greens with the rest of the site being carpark
and access. The majority of the site grades from the east (Lanyana Way) to the west (Noosa
Drive). A small part of the site drains back to towards Lanyana Way. Currently stormwater
from the site is collected via internal drainage and discharged into Pinaroo Rotary Park to the
west. The site does not have any external catchments that contribute to the site.

Environmental best management practices are proposed for treatment of stormwater
flowing through the site. Stormwater will be treated by a number of treatment devices prior
to discharge to the receiving environment. The stormwater treatment train for the site will
include collection of runoff from roofed areas in rainwater tanks for re-use, with overflow
and runoff from carparks directed into bioretention areas prior to discharging off-site.

Non-worsening of peak flows has been demonstrated through the incorporation of detention
systems in two of the sub-catchments. The catchments draining to the west do not require
mitigation measures as the catchment area has been reduced from the existing to the
developed scenarios.

This Integrated Water Management Plan demonstrates that effective treatment of
stormwater at the proposed development can be achieved through the application and
appropriate design of Water Sensitive Urban Design (WSUD) principles in accordance with
legislative requirements and best practice guidelines. The treatment train proposed for the
development site achieves the performance criteria set by the Sunshine Coast Regional
Council. Through the implementation of detention systems within the catchments non-
worsening criteria has been achieved to ensure no downstream impacts.
Log in to download the original file

Engineering Hydrology Plans (IWMP).pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.