Original source · versioned page text
Engineering Hydrology Plans (IWMP)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnContents EXECUTIVE SUMMARY I 1 INTRODUCTION 1 1.1 SITE CHARACTERISTICS 1 2 STORMWATER QUALITY 4 2.1 DESIGN OBJECTIVES 4 2.1.1 TYPICAL POLLUTANTS 4 2.1.2 OPERATIONAL DESIGN WATER QUALITY OBJECTIVES 4 2.2 STORMWATER QUALITY TREATMENT 5 2.2.1 STRATEGY 5 2.3 MODELLING APPROACH 6 2.3.1 MUSIC PARAMETERS 6 2.3.2 CATCHMENT AREAS 7 2.3.3 MUSIC MODEL LAYOUT 7 2.4 TREATMENT MEASURES 9 2.4.1 RAINWATER TANKS 9 2.4.2 BIORETENTION SYSTEM 10 2.5 RESULTS 13 3 STORMWATER QUANTITY 14 3.1 EXISTING SCENARIO 14 3.2 RATIONAL METHOD CALIBRATION 15 3.3 DEVELOPED SCENARIO 18 3.4 MITIGATED SCENARIO 20 4 CONCLUSIONS 21 5 REFERENCES 22 FIGURES Figure 1: Locality Plan 2 Figure 2: Proposed Development Layout 3 Figure 3: Conceptual Treatment Train 5 Figure 4: Model Layout 7 Figure 5:Stormwater Quality Catchment Plan 8 Figure 6: Stormwater Quality Management Strategy 12 Figure 7: Existing Scenario WBNM Sub-Catchments 17 Figure 8: Developed Scenario WBNM Sub-Catchments 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.