Engineering Hydrology Plans (IWMP)

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
TABLES

Table 1: Pollutants typically generated during the operational phase                4
Table 2: Site stormwater quality objectives (operational phase)                     4
Table 3: MUSIC Base and Storm Flow Concentration Parameters - Commercial            6
Table 4: MUSIC Runoff Generation Parameters - Commercial                            6
Table 5: Impervious Percentage                                                      7
Table 6: Catchment Areas                                                            7
Table 7: MUSIC Rainwater Tank Demands                                              10
Table 8: MUSIC Rainwater Tank Parameters                                           10
Table 9: Bioretention Basin Design Parameters                                      11
Table 10: MUSIC Results – Load-Based Pollutant Outputs at Outlet to Site           13
Table 11: MUSIC Results – Load-Based Pollutant Outputs for Road Area               13
Table 12: WBNM Sub-Catchment Fraction Impervious Values – Existing Scenario        14
Table 13: Existing Scenario WBNM Outlet Peak Flows                                 15
Table 14: Rational Method Calibration Summary (Total Catchment)                    15
Table 15: Rational Method Peak Flows Versus WBNM Peak Flows                        16
Table 16: WBNM Sub-Catchment Fraction Impervious Values – Developed Scenario       18
Table 17: Developed Scenario WBNM Outlet Peak Flows                                18
Table 18: Storage and Outlet Details of Detention System                           20
Table 19: Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows   20


APPENDICIES

Appendix 1: Rational Method and WBNM Results                                       23
Log in to download the original file

Engineering Hydrology Plans (IWMP).pdf · 5.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.