Original source · versioned page text
Engineering Hydrology Plans (IWMP)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTABLES Table 1: Pollutants typically generated during the operational phase 4 Table 2: Site stormwater quality objectives (operational phase) 4 Table 3: MUSIC Base and Storm Flow Concentration Parameters - Commercial 6 Table 4: MUSIC Runoff Generation Parameters - Commercial 6 Table 5: Impervious Percentage 7 Table 6: Catchment Areas 7 Table 7: MUSIC Rainwater Tank Demands 10 Table 8: MUSIC Rainwater Tank Parameters 10 Table 9: Bioretention Basin Design Parameters 11 Table 10: MUSIC Results – Load-Based Pollutant Outputs at Outlet to Site 13 Table 11: MUSIC Results – Load-Based Pollutant Outputs for Road Area 13 Table 12: WBNM Sub-Catchment Fraction Impervious Values – Existing Scenario 14 Table 13: Existing Scenario WBNM Outlet Peak Flows 15 Table 14: Rational Method Calibration Summary (Total Catchment) 15 Table 15: Rational Method Peak Flows Versus WBNM Peak Flows 16 Table 16: WBNM Sub-Catchment Fraction Impervious Values – Developed Scenario 18 Table 17: Developed Scenario WBNM Outlet Peak Flows 18 Table 18: Storage and Outlet Details of Detention System 20 Table 19: Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows 20 APPENDICIES Appendix 1: Rational Method and WBNM Results 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.