Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2605-52260 SRA Response with conditions

Attached to the e-mail RAL26/0011 - SARA response with conditions.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                    2605-52260 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (A copy of the document referenced below is found at Attachment 5)


 No.     Conditions                                                                     Condition timing
 Schedule 10, Part 9, Division 4, Subdivision 2, Table 1, Item 1 (10.9.4.2.1.1) – Reconfiguring a lot near
 a state transport corridor—The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Transport and Main Roads to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following condition(s):
 1.      (a) Road access is located at approximate GPS: Longitude                       (a) At all times.
             152.990281, Latitude -26.376931, generally in accordance with
             the Plan of Reconfiguration, prepared by Therfor Group, dated
             03-12-2025, drawing no. 24-0565P-01 sheet 2 of 2, revision A
             (as amended in red by SARA) and is to be maintained at no cost
             to the Department of Transport and Main Roads.
 2.      (a) Provide access easements on the title of proposed Lot 1 for the            (a) At the time of Plan
             shared access for proposed Lot 2 generally in accordance with              of Survey registration.
             the Plan of Reconfiguration, prepared by Therfor Group, dated
             03-12-2025, drawing no. 24-0565P-01 sheet 2 of 2, revision A
             (as amended in red by SARA).
                                                                                        (b) Within 20 business
         (b) Provide evidence that part (a) of this condition has been                  days of registration of
             complied with to the North Coast Region Corridor Management                the easements.
             Team within the Department of Transport and Main Roads via
             email at [email protected] Assessment and Referral Agency                                                                   Page 4 of 7
Log in to download the original file

2605-52260 SRA Response with conditions.pdf · 332 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.