Original source · versioned page text
2605-52260 SRA Response with conditions
Attached to the e-mail RAL26/0011 - SARA response with conditions.
2605-52260 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.6). If a word remains
undefined it has its ordinary meaning.
Public utility works and connection approval
2. The applicant is advised that if any works and/or connections are required to public utility
services within a state-controlled road reserve, approval must be given by the Department of
Transport and Main Roads under the relevant public utility legislation (electricity, water/sewer,
telecommunication), and in accordance with TMR technical standards (Non-Transport Utility
Management and Design Manual)
Non-Transport Utility Management and Design Manual (Department of Transport and Main
Roads).
Approvals must be obtained prior to commencing any utility works within the state-controlled
road reserve. Please contact the public utility team via [email protected] for further
information on the application and approval process.
State Assessment and Referral Agency Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original