Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614
Plans and drawings: the text below has words only, no drawings.
Very large file (13.9 MB): may take a few minutes to open.
Response column key:
Achieved
10.1 Tidal works, or development in a coastal management district state code PIS Performance solution
N/A Not applicable
Table 10.1.1: All development
Performance outcomes Acceptable outcomes Response Comment
P01 Development in a coastal hazard A01.1 Development is located outside a high coastal Achieved These works are located within a coastal hazard area
area is compatible with the level of hazard area unless it is: (erosion prone area) and are considered to be essential as
severity of the coastal hazard. (1) coastal-dependent development, or they are for the protection of the Noosa River Caravan Park
(2) temporary, readily relocatable, or able to be located at Munna Point.
abandoned,or
(3) essential community service infrastructure, or
(4) small- to medium-scale tourist development, or
(5) development that is compatible with temporary .
inundation due to its nature or function, or
(6) within an existing built-up urban area, or is
redevelopment of built structures that cannot be
relocated or abandoned.
AND
A01.2 Development referred to in A01.1(6) avoids being N/A These works do not involve the redevelopment of built
located within a high coastal hazard area, or where this is structures.
not practicable, minimises the exposure of people and
permanent structures to coastal hazard impacts and
mitigates residual impacts where it is not practicable to
locate the development outside a high coastal hazard
area.
P02 Development siting, layout and A02.1 Development within a coastal hazard area is Achieved These works enhance the Noosa River Caravan Park’s
access in a coastal hazard area located, designed, constructed and operated to maintain resilience to storm tide events.
responds to a potential coastal hazard or enhance the community’s resilience to defined storm
and minimises risk to personal safety and tide events and coastal erosion by limiting the exposure of
property. people and structures to coastal hazard impacts and
ensuring:
(1) habitable rooms of built structures are located above
the defined storm tide event level and any additional
freeboard level that would ordinarily apply in a flood
prone area under a relevant planning scheme
standard, or
(2) a safe refuge is available for people within the
premises during a defined storm tide event, or
(3) at least one evacuation route remains passable for
emergency evacuations during a defined storm tide
event, including consideration of the capacity of the
route to support the evacuation of the entire local
population within a reasonably short time frame (for
State development assessment provisions Module 10-Coastal protection 21 June 2013 Page 1 of 15
10.1 Tidal works, or development in a coastal management district state code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614Related documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.