Performance outcomes I Acceptable outcomes Response I Comment I
example, 12 hours).
AND
A02.2 Development within a coastal hazard area is Achieved These works enhance the Munna Point Caravan Parks
located, designed and constructed to ensure exposed resilience to storm tide events.
structures can sustain flooding from a defined storm tide
event.
AND
A02.3 Essential community service infrastructure is: N/A These works do not include any community infrastructure.
(1) located so that it is not inundated by a recommended
storm tide event specified for that infrastructure, or
(2) located and designed to ensure any components of
the infrastructure that are likely to fail to function or
may result in contamination when inundated by a
storm tide (for example, electrical switch gear and
motors, water supply pipeline air valves) are:
(a) located above the peak water level for a
recommended storm tide event, or
(b) designed and constructed to exclude storm tide
intrusion or infiltration (including by being located
in the ground), or
".
(c) able to temporarily stop functioning during a
recommended storm tide event without causing
significant adverse impacts to the infrastructure
or the community.
AND
A02.4 Emergency services infrastructure and emergency N/A These works do not impact any emergency services
shelters, police facilities, and hospitals and associated infrastructure.
facilities have an emergency rescue area above the peak
water level for a recommended storm tide event.
AND
A02.5 Redevelopment of existing built structures avoids N/A The work does not involve the redevelopment of existing
increasing the exposure of people and permanent structures.
structures to adverse coastal hazard impacts (including
impacts on the development’s ongoing operation).
P03 Development directly, indirectly and A03.1 Development avoids increasing the number of Achieved. These works reduce erosion risk at Munna Point and
cumulatively avoids an unacceptable premises from which people would need to be evacuated therefore do not increase the severity of the coastal hazard.
increase in the severity of the coastal to prevent death or injury from a defined storm tide event.
hazard, and does not significantly
increase the potential for damage on the
premises or to other premises.
P04 Development avoids the release of A04.1 Development that involves the manufacture or N/A These works do not involve the manufacture or storage of
State development assessment provisions Module 10 -
Coastal protection 21 June 2013 Page 2 of 15
10.1 Tidal works, or development in a coastal management district state code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Plan and Site photos - OPW13/0614Related documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.