Council archive · source document
17 Bottlebrush Avenue, · MCU26/0001
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
1 Introduction 1.1 Background and Scope RECOR has been engaged by Made Capital to prepare a Stormwater Management Plan (SWMP) for the proposed MCU from a single dwelling residence to a multiple residential dwelling, located at 17 Bottlebrush Avenue, Noosa Heads. This report has been prepared to support the Development Approval Application submission to Noosa Shire Council and any nominated referral agencies. The proposed development’s property details have been summarised in Table 1-1. The SWMP addresses potential stormwater impacts resulting from the proposed development and outlines the necessary mitigation measures to meet both quantity and quality requirements of Noosa Shire Council. This report presents the hydrological assessment of the proposed development, including any external catchments that may directly influence peak flows exiting the site. The purpose of the assessment is to ensure that post- development stormwater discharge does not adversely impact existing flooding or stormwater conveyance conditions on surrounding properties and that the stormwater management objectives of the QUDM and Noosa Shire Council requirements are achieved. Additionally, the assessment evaluates the development requirements for stormwater treatment to ensure compliance with Water by Design guidelines, the SPP, and council water quality requirements. Table 1-1 Property Details Site Details Parameters Site Location 17 Bottlebrush Avenue, Noosa Heads QLD Lot Number 143 RP88934 Intended Land Use Material Change of Use for a Multiple Residential Dwelling Development Area 505 m2 1.2 Stormwater Management Objectives and Design Approach The intent of this report is to document the design considerations and outcomes that satisfy the stormwater management objectives for the proposed development. The strategy has been developed to address the following key aspects and performance objectives: • Catchment Definition: Identification of all catchments and sub-catchments discharging through or into the site. • Hydrological Assessment: Determination of existing flow conditions for multiple storm events and assessment of development impacts on surrounding properties. • Flow Management: Ensuring post-development peak flows do not exceed pre-development flows across all relevant storm events, up to and including the 1% AEP. • Lawful Point of Discharge: Identification and utilisation of a lawful point of discharge in accordance with QUDM, ensuring no actionable nuisance to downstream properties or infrastructure. 17 BOTTLEBRUSH AVENUE, NOOSA HEADS 7 January 2026 P a g e |4 Stormwater Management Plan Client Reference: P0433-25-001 Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.