Council archive · source document
17 Bottlebrush Avenue, · MCU26/0001
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
• Site Drainage and Conveyance: Development of a preliminary site drainage layout that ensures safe
conveyance of stormwater through the site without adverse impacts on adjacent areas.
• Erosion and Sediment Control: Adoption of construction-phase measures consistent with the International
Erosion Control Association (ICEA) – Best Practice Erosion and Sediment Control (2008) guidelines.
Stormwater management for the proposed development has been designed in accordance with the following
documents:
• Noosa Shire Council Planning Scheme Policy – Stormwater Management
• State Planning Policy (SPP), 2017
• Environmental Protection (Water) Policy, 2009
• Environmental Protection Act 1994
• Queensland Urban Drainage Manual (QUDM) Fourth Edition, 2016
• Australian Rainfall and Runoff Guideline (ARR)
1.3 Supporting Documentation and Reports
The SWMP is supported by technical documentation and reports which provide the basis for the engineering
recommendations and support the DA and OPW application, including:
• Civil Design Drawings prepared by RECOR, File No: P0433-25-001_17_Bottlebrush_Avenue_REVA
17 BOTTLEBRUSH AVENUE, NOOSA HEADS
7 January 2026 P a g e |5
Stormwater Management Plan
Client Reference: P0433-25-001
Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.