Original source · versioned page text
Annual Report 2018-19
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Corporate Plan Theme 5 - Excellence as a Council
“The Noosa Shire community is proud of its Council”
Key achievements as we work towards our long term »» Council undertook our second detailed Community
goal include: Satisfaction Survey. The Survey was undertaken
by an independent professional survey firm (Market
Specific Operational Plan Priorities Facts) using the same methodology as the 2017
Community Satisfaction Survey. The results of the
»» Council continued to look at ways in which it can 2019 survey identified that Council was achieving
improve services. One of the most important steps a community satisfaction score significantly
last year was the development of a Level of Service above comparable Councils in almost all service
Catalogue which was substantially completed as categories.
part of the 2018/19 budget process with further
• Council’s overall weighted performance index
enhancements for the 2019/20 budget process.
was 74.59% (up from 73.20% in 2017).
Council now has documented service details of
what services it provides, costs, response times and • Top performing services were Libraries (84.9%),
benchmarking. The Level of Service Catalogue is Waste management (81.5%), and Customer
available on Council’s website. Service (81%).
»» Council completed the replacement of the Tewantin • Three quarters of those surveyed who had
contacted Council rated the service of staff as
Council administration building roof which included good or very good.
the installation of a significant number of solar
panels. Long-term precinct planning will be »» Council has undertaken a review of its
undertaken in 2019/20. Communications and Engagement Strategy.
This has entailed internal consultation and the
development of a new draft strategy.
»» The revenue diversification project has commenced
looking at options to increase non rate revenue in
order to reduce pressure on any future rates rises.
An internal working group has been established
which is working on a strategy and project plan.
Other initiatives to enable Council to achieve its goal for
this theme
»» Council’s corporate website has started the
transition to a new content management system.
Solar installation at Tewantin administration building The Community Engagement team has collaborated
with the LGAQ to finalise a new-look for the
»» We transitioned our ICT systems to the latest website.
version which provided enhanced systems
capability. These systems upgrades included the »» Council has increased its presence on and use of
implementation of Technology One’s “Enterprise social media platforms, to improve communication
Cash Receipting” and “Procure to Pay”. We and engagement with the wider community. A more
continue to roll out our ICT Strategy to enhance targetted approach to social media engagement on
our system capabilities and we have commenced Facebook and Linkedin has been taken. Facebook
a major project to transition our property and rating followers increased by 18% to 8,923. Linkedin
system. This project will add significant benefits to followers grew by 55% to 2,022.
our community with more online services.
Noosa Council | 2018/2019 Annual Report Page 24
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2018-19(PDF, 5MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.