TEMPORARY CONSTRUCTION ROCK DAM @ 30m CTS.
S
kl 7.70 tw 8.72 8.00 tw 8.32
SEDIMENT & EROSION CONTROL NOTES
tw 8.37 tw 8.64 tw 8.07 8.0
8.00
8 .0
7.75
7.75
0
ACCESS. REFER DETAIL DRG ESC02 REFER DETAIL DRG ESC02
O/s 0.15
X X X X X X X X X X X X X X X X
O/s 0.13
7.75
7.50
7.75
0
7.50 7.75
1. ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN
7.10 7.50
7.94
> > > > > > > > > > > > > > > > > > > > LEGEND:
7.90 7.23 7.25
ACCORDANCE WITH THE I E AUST SOIL EROSION & SEDIMENT CONTROL MANUAL,
7.75
PROPOSED SILT FENCE. PROPOSED PIT
6.87
D
cl 7.90
T
7.00
REFER DETAIL DRG ESC02 PROTECTION. AS DETAILED ON THIS PLAN, OR AS REQUIRED FOR COMPLIANCE WITH THE
X
REQUIREMENTS OF THE ENVIRONMENTAL MANAGEMENT PLAN.
kl 7.66
>
7.47 7.33
EB 7.75 EB 7.77 REFER DETAIL PROPOSED PIT PROTECTION - REFER DETAIL
E
6.40
DRG ESC02
>
S
7.09
2. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION
7.29 7.28
TEMPORARY SWALE TO
>
X
7.38
CONTROL DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS:
SEDIMENT
7.26 BASIN '1'. X X PROPOSED SILT FENCE (INCLUDING 2.0m
>
kl 7.63 EB 7.71
7.35 7.01
WINGS AT 5.0m CENTRES) (A) DURING CONSTRUCTION
(i) DAILY DURING DRY WEATHER
EB 7.71
>
D
1
T
CONSTRUCTION ENTRY/EXIT - REFER DETAIL
6.97
X
7.50
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
(ii) PRIOR TO PREDICTED STORM EVENTS
X
7.36 7.22
E
6.26
PROPOSED SILT FENCE. 7.74 8.02
(iii) TWICE DAILY DURING PROLONGED RAIN
8.00
7.75
2
REFER DETAIL DRG ESC02
7.82
WASH (iv) DURING AND AFTER MAJOR STORM EVENTS
7.73 7.41 7.41 7.27
S
cl 7.82
7.37 ROCK DAM @ 30m CTS.
(B) DURING DEFECTS LIABILITY PERIOD
X
DOWN REFER DETAIL DRG ES02
> > > > > > > > >
3
7.42
X
kl 7.59
(i) WEEKLY DURING DRY WEATHER
7.34
7.45 7.20
7.50
7.27
BAY
7.40
(ii) PRIOR TO PREDICTED STORM EVENTS
23
FL 8.31 7.54 7.46 7.25
FL 7.61 7.00 6.95
4
(iii) TWICE WEEKLY DURING PROLONGED RAIN
D
T
X PROPOSED SILT FENCE.
(iv) DURING AND AFTER MAJOR STORM EVENTS
X
22
7.25
REFER DETAIL DRG ESC02
5
kl 7.55 O/s 8.06
CARPARK WORKSHOP 6
3. THE CONTRACTOR IS TO CONSTRUCT AN ENTRY/EXIT SEDIMENT TRAP AS
.2
S
13
21
7.70
Lot 256 MCH 4539 ge
X
rid
6
DETAILED PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS.
D
X
FL 0.00
ROCK DAM @ 30m CTS.
7.25
20
7.69
REFER DETAIL DRG ESC02 4. ALL STOCKPILES TO BE TEMPORARILY GRASSED & GRADED TO ENSURE CONTROL
OFFICE
SLMH - 6.54
D
OF RUNOFF. ALTERNATIVELY, SEDIMENT FENCES TO THE DOWNSTREAM FACE OF
T
X
19
IL - 4.57
cl 7.04
7.74 7.59
X
STOCKPILES ARE TO BE INSTALLED, WITH CUT-OFF DRAINS UPSTREAM.
6.25
kl 7.50
ROCK DAM
FL 7.43
@ 30m CTS.
REFER DETAIL DRG ESC02
W 5. ROUGHEN ALL SURFACES PRIOR TO TOPSOIL PLACEMENT. ROUGHENING TO
O/s 3.17
W W
X
7.65
W W CONSIST OF LATERAL (90° TO SLOPE) GROOVES 100mm DEEP AT 2m MAX.
D
X
kl 7.49
W W
18
8
.8
0
6.83
SPACINGS.
10
7.5
FL 7.42
63500 mm 90° 00' 00"
ge
0
7.53
7.5
rid
7
O/s 3.90
kl 7.48 7.55
17
>>
PROPOSED PIT
7.65
6. ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY STABILISED
X
7.25
W
D
7.50
6
X
.0
PROTECTION.
7.49
10
8
TO PREVENT EROSION. ROUGHEN SURFACE BY FORMING LATERAL GROOVES
TG
S
REFER DETAIL
7.32
16
50mm DEEP AT 1m MAX. SPACINGS AND 5m MAX. LENGTHS.
>>
DRG ESC02 7.49
T
9
7.31
X
D
TEMPORARY SWALE TO 7. SEDIMENT & EROSION CONTROL DEVICES (OTHER THAN THOSE ALREADY SHOWN)
15
X
> > > > > > > > > > > > > > > > > >
6.50
6.50
7.49
10
SEDIMENT BASIN '1'. 7.48 TO BE INSTALLED WHERE NECESSARY & AS DIRECTED ON SITE BY THE
>
C1
SUPERINTENDENT.
14
7.57
B
PROPOSED PIT
W
X
7.51
11
D
X
PROTECTION.
7.50
8. SEDIMENT & EROSION CONTROL DEVICES ON THIS PLAN ARE INDICATIVE ONLY. IT
STREET
13
S
REFER DETAIL
6.25
kl 7.44
IS THE RESPONSIBILITY OF THE SITE MANAGER TO ENSURE THAT THE INTENT OF
12
6
7.24 .0
12
C1
7.34
ge DRG ESC02
T
7.38 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.