Attachment 7 - Civil Drawings_LR
Original PDF page 19, section 2. The text section number identifies this passage in the reader.
6.80
THIS PLAN AND THE ENVIRONMENTAL MANAGEMENT PLAN ARE COMPLIED WITH.
7.40
rid
X
7.51
D
B
X
cl 7.63
7.36 B
B 9. EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES TO BE COMPLETED
C1
FL 7.41
TEMPORARY SWALE TO PRIOR TO DISTURBANCE OF THE SITE, AND SHALL REMAIN IN PLACE UNTIL
Transformer enclosure
kl 7.42
W
X
23
SEDIMENT BASIN '1'.
D
PERMANENT WORKS ARE COMPLETE AND CATCHMENT VEGETATION IS
7.60 .
12
X
9
7.46
.5
ge
Survey control station
10
rid
ESTABLISHED (75% GRASS COVER MINIMUM) .
TG
S
O/s 9.17
FL 8.25 B
B 7.
25
BUS PARKING
T
C1
10. AREAS OF WORKS THAT REQUIRE DISTURBANCE OF SOIL SHALL BE KEPT TO A
X
7.30
B
X
E 7.30 Lot 257 MCH B4891 C1 MINIMUM TO LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP IMPACT AND OTHER
FORMS OF WIND/STORMWATER EROSION.
PROPOSED SILT FENCE.
W
X
6.25
D
REFERcl 7.56
DETAIL DRG ESC02 11. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS
X
E FL 7.41
kl 7.35
B
6.25
D
S
7.57
B 6.74 STANDARD SPECIFICATION.
C1
7.25
7.48
O/s 3.23
7.34
B
T
X
E
B
C1
6.86
X
7.53
SEDIMENT BASIN NOTES
6.00
6.93
TEMPORARY CONSTRUCTION 6.97
SEDIMENT BASIN TO BE CONSTRUCTED WITH A MINIMUM 300mm
W
X
ACCESS. REFER DETAIL DRG ESC02 B
X
D
B NON-DISPERSIVE LAYER OF SOIL TO ALL BANKS.
D
S
C1
7.54
B
E
B THE SEDIMENT BASINS ARE TO BE A “WET” TYPE. ALL DECANTING TO BE VIA
C1
T
cl 7.49
PUMPING.
kl 7.28
X
6.74
7.41
PRODUCTION
7.21
7.06 THE WATER CONTAINED IN THE BASIN SHOULD BE DOSED WITH A
B
7.50
W
B FLOCCULANT (GYPSUM) FOLLOWING RAINFALL EVENTS & TESTED PRIOR TO
X
BUS PARKING
C1
D
B RELEASE. WATER SHALL NOT BE RELEASED UNTIL COUNCIL WATER QUALITY
D
S
6.94
B PARAMETERS ARE ACHIEVED. THE BASIN SHALL THEN BE PUMPED DRY
C1
E
X
6.78
Lot 274 MCH 4891
T
APPROX. 36 HOURS AFTER FILLING IN PREPARATION FOR FUTURE RAINFALL.
X
FL 0.00
PROPOSED TEMPORARY SEDIMENT BASIN '1'
(AS PART OF EARLY WORKS) DECANTING SHALL BE VIA A PUMP WITH FLOATING INLET SUCH THAT WATERS
|
| |
B
X
kl 7.22 | |
TOTAL VOLUME = 163m³ ARE DRAWN FROM THE SURFACE TO MINIMISE RE-SUSPENSION OF
cl 7.47
B 6.63 6.60
| |
Emergency bus park
C1
W
il PIT
5.957.18
| |
REFER DWG ESC04 FOR DETAILS B SEDIMENTS.
X
| |
D
kl 7.21 | |
7.11
B
C1
D
S
| |
| |
SEDIMENT BASIN IS TO REMAIN IN PLACE UNTIL 70% GROUND COVER IS
E
X
| |
| |
T
7.30
ACHIEVED ON DISTURBED AREAS. THE BASIN MAY THEN BE BACKFILLED IN
| |
D
6.65
ROCK DAM @ 30m CTS. PROPOSED PIT
| |
X
300mm LAYERS, TOPSOILED AND GRASS SEEDED.
| |
B6.75 | |
kl 7.19
REFER DETAIL DRG ESC02 B PROTECTION. | |
C1
| |
X
REFER DETAIL
PIT 7.15
30
PROPOSED SILT FENCE. SEDIMENT BASIN EMBANKMENT SHALL BE INPECTED BE THE SUPERVISING
|
7.
W
DRG ESC02
M
REFER DETAIL DRG ESC02 ENGINEER PRIOR TO PLACEMENT OF FILL.
X
> > > > > > > > > > > > > > > > > > >
TB
D
S
cl 7.42 6.78 6.78
7.08
E
6.42
X
6.65
6.54 6.37
0 4 8 12 16 20
X X X X X X X X X X X X X X X
6.00
kl 7.18
6.30
6.75
6.25
X
6.50
5
6.75
6.2
7.22
7.25
SCALE 1:200 (A1), 1:400 (A3)
S S S S S S S S S S
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL EROSION AND SEDIMENT CONTROL LAYOUT
PRELIMINARY Date: MAY 2024
A.B.N. 91 611 354 511
26 Memorial Avenue, Cotton Tree PROPOSED KINETIC BUS DEPOT DEVELOPMENT
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 5 PRODUCTION STREET, NOOSAVILLE DRAWING No:
A6880/24/ESC01 1 of 3
Email: [email protected]
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for INTEGRAL CONSTRUCTION
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : A6880-24-ESC01 - SEDIMENT AND EROSION CONTROL LAYOUT.dwg - DATE : 3/6/24 - 3:43pm - XREF's: X-BASE; X-SURVEY; X-ARCH; X_SURV; X_ARCH - GROUND 0 Council Ref: .......................
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.