Council archive · source document
ECM_22535103_v5_Decision Notice - DBW23 0030 · DBW23/0030
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
00.0 - Site Plan, prepared by Paul Clout Design 06/7/2023
01.0 - Ground Floor Plan, prepared by Paul Clout Design 06/7/2023
02.0 - Upper Floor Plan, prepared by Paul Clout Design 06/7/2023
03.0 - Roof Plan, prepared by Paul Clout Design 06/7/2023
04.0 - Elevations, prepared by Paul Clout Design 06/7/2023
05.0 - Elevations & Section, prepared by Paul Clout Design 06/7/2023
Currency Period
3. This development approval lapses if the use has not happened by 8 August 2025, unless
an application to extend the currency period is approved by Council.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $3,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Noosa Waters Setback
5. The area within 4.5 metres of the centre line of the top of the concrete revetment wall must
be developed in accordance with the following:
a. a minimum of 25% of the area must be planted with shrubs and small trees with a
mature height of 3m or less.
b. a maximum of 25% of the area may be impervious, with the balance area soft
landscaping (i.e. grass, ground covers, shrubs and small trees).
c. the ground surface within 1 metre of the revetment wall must be grass or ground cover
and must not include shrubs, hard pavement or artificial grass.
d. any side boundary fencing must taper down to a maximum height of 1.2 metres at the
revetment wall and have a height not exceeding 1.5 metres at a distance of 2.25 metres
from the revetment wall.
e. any retaining structures, planter boxes or the like must be finished with natural
materials such as timber or rock rather than manufactured materials.
Revetment Wall / Flood Storage
6. All works must be carried out in accordance with the approved plans and Reference
Document No. 221281 prepared by Lindsay Consulting Pty Ltd dated 14 June 2023.
7. Certification of the completed works within the 4.5m setback from the revetment wall must
be submitted to Council within 3 months of the completion of the works. The certification must
be prepared by a RPEQ (Registered Professional Engineer of Queensland) and state that
the works:
Page 2 of 5
Document Set ID: 22535103
Version: 5, Version Date: 10/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_22535103_v5_Decision Notice - DBW23 0030.pdfRelated documentApplication case desk ↗
About this file
- File size
- 143 KB (small file)
- File type
No other editions are linked here.