Skip to the record
Every meeting, every word.

Original source · versioned page text

2023-02-13 General Committee Meeting Agenda

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   13 FEBRUARY 2023




                                       Page 43 of 70

GENERAL COMMITTEE MEETING AGENDA                                                                  13 FEBRUARY 2023

        Corporate Plan Theme - The Noosa Community                                                                                                       Operational Plan 22/23
        Corporate Plan Key   Operational Initiatives        OI reel an                                    Responsible Areas    Update                                  Q2 Status
        Focus Areas
        the Sport and                                                                                                        Non-Powered Water sports feasibility study
        Active Recreation                                                                                                    underway, Master Planning projects for
        Plan                                                                                                                 NDSC and Cooroy Sports complexes being
                                                                                                                             progressed. Noosa Leisure Centre Needs
                                                                                                                             Assessment ITQ has been progressed and
                                                                                                                             consultant appointed.
                             Living Well Noosa              Increased community health and wellbeing      Community          Launched November 2022 with a range of | On track
                                                                                                          Development        activities on offer.
                             Early literacy programs        Delivery of learning programs for children aged | Libraries &    Libraries have delivered 47 x early literacy | On track
                                                           0-5 and their families to improve early literacy | Galleries      programs (storytime and babes in arms)
                                                           outcomes                                                          with 964 attendees; 7 x school holiday
                                                                                                                             activities with 179 attendees and 1
                                                                                                                             preschool visit with 51 attendees.
                             Heritage Noosa Stage 3         Increase preservation and awareness of        Libraries &        Ongoing content development continuing    On track
                                                            Noosa’s heritage                             Galleries           consistently.
                                                                                                                             Q2 comment: Milestone of 10,000 items on
                                                                                                                             site reached at 31/12/2022.
                             Development of                 Preservation of heritage sites                Libraries &        Sites identified, ITQs being drafted.     On track
                            conservation management                                                     Galleries            Q2 comment: contracts issued, site visits
                             plans for two additional                                                                        scheduled for early Jan 2023.
                             heritage sites
                             Undertake heritage studies     Implementation of recommendations fromthe | Libraries &          Ongoing research and analysis, moving     On track
                                                            Local Heritage Register Review to ensure best | Galleries        towards next stage of project.
                                                            practice management and protection of Noosa’s                    Q2 comment: set of administrative updates
                                                            heritage sites                                                   to Heritage Overlay in planning scheme
                                                                                                                             developed and going to Council meeting;
                                                                                                                             community consultation for March 2023
                                                                                                                             being developed.
                             Develop scope of               Implementation of recommendations of the      Libraries &        Consultant retained and site visit        Completed
                             remediation works for         Conservation Management Plan                  Galleries           undertaken.
                            Cooroy Butter Factory                                                                            Q2 comment: report received.
                             brickwork

                                                                                                          Page 43 of 70
Log in to download the original file

2023-02-13 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.