Skip to the record
Accept no substitutions.

Original source · versioned page text

2023-02-13 General Committee Meeting Agenda

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   13 FEBRUARY 2023




                                       Page 48 of 70

GENERAL COMMITTEE MEETING AGENDA                                                                 13 FEBRUARY 2023

        Corporate Plan Theme — The Noosa Economy                                                                                                        Operational Plan 22/23
        Corporate Plan Key    Oy ole ielelare Manito)        Outcomes                               Ines erelasiiel ls Update                                         Q2 status
        Focus Areas                                                                                  Areas
        3.4 Support the       Support technology             Acceleration of business and employment) Economic       Priority Projects                                On track
        growth of our         initiatives - including the    growth                                  Development     Hub Tenancies’/Memberships
        education and         Peregian Digital Hub                                                                   Hub memberships reflect slow-down in tech sector
        research sector                                                                                              with some job loss and cost cutting
                                                                                                                     Overall demand for hub remains strong and at
                                                                                                                     capacity going into February 2023.
                                                                                                                     Construct Digital Hub 2 (Data Lab)
                                                                                                                     Design/Construct contract awarded to Carfax;
                                                                                                                     Structural works complete. Glazing and cladding
                                                                                                                     work ongoing. ITQ for AV fit out underway
                                                                                                                     On track for late February 2023 completion.
                                                                                                                     Industry Capability — delivered 3 x cadetship
                                                                                                                     programs (Design and Web Development.
                                                                                                                     Tech Recruitment — hosted Atlassian technical
                                                                                                                     recruitment drive with 120 x jobseekers.
                                                             Expansion of Peregian Digital Hub and   Economic        Trials completed in Q2 (November).               On track
                                                             rollout of the FireTech program         Development     Delivered the following outcomes:
                                                                                                                     Bushire Detection Al camera system in partnership
                                                                                                                     with Pano Al.
                                                                                                                     Autonomous Firefighting systems in partnership
                                                                                                                     with Rheinmetall, Telsra.
                                                                                                                     Fire air traffic management system in partnership
                                                                                                                     with Ripper Corp.

                                                                                                          Page 48 of 70
Log in to download the original file

2023-02-13 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.