Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2023-02-13 General Committee Meeting Agenda

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   13 FEBRUARY 2023




                                       Page 49 of 70

GENERAL COMMITTEE MEETING AGENDA                                                                   13 FEBRUARY 2023

        Corporate Plan Theme - Long Term Planning for Noosa Shire                                                                                         Operational Plan 22/23
        Corporate Plan Key    Operational Initiatives       Outcomes                             Responsible Areas     Update                                          Q2 Status
        Focus Areas
        4.1 Adopt a new Town} Continue to monitor and        Land use and development           Director              Working through proposed amendments with the     On track
        Planning Scheme       review as required through | outcomes are aligned with the         Environment &        State. Housing inclusionary zoning causing delays.
                              amendments to the Noosa_|     strategic intent of Noosa Plan       Sustainable          Likely to be put to Council early 2023.
                              Plan to ensure its                                                 Development
                              application continues to
                              achieve strategic
                              objectives for sustainable
                              development
                              Continue rollout of Place      Measured improvement in liveability | Director           Place score data analysed. Internal stakeholder  On track
                              Making project including      through planning, design, and        Environment &        workshop held.
                              identification of a pilot      management of public spaces         Sustainable
                              place for the place program                                        Development
        4.2 Implement an      Continue to implement         Transport options contribute        Director              Operational activities ongoing - Free Holiday    On track
        integrated Transport | priority activities from the  positively to a strong economy, the | Infrastructure     Buses, Free Weekend Buses, Flexi Link Cabs,
        Strategy that         Noosa Transport Strategy       health and wellbeing of the         Services             Council Cabs, Schools Program, Community
        encourages alternative                              community and a low carbon future                         programs, Transport Planning activities in
        transport usage and                                                                                           coordination with Translink.
        reduces our           Integrated transport and       Planning for future transport and   Strategic Land Use | Project needs have been scoped in combination    On track
        dependence on         Land Use modelling            traffic infrastructure requirements | Planning            with Infrastructure Planning & Design.
        private motor vehicles                              supports future development
                              Implement the Walking and | Facilitation of walking and cycling for | Infrastructure    2411m of pathway is being delivered this financial | On track
                              Cycling Strategy              transport, recreation, health, and   Planning, Design & | year with 543m under construction. The delivery of
                                                            tourism                             Delivery              walking and cycling Infrastructure is on track,
                                                                                                                      accepting end of trip facilities which are only of
                                                                                                                      being delivered in coordination with existing capital
                                                                                                                      projects. This includes priority infrastructure
                                                                                                                      projects listed in the NCWSIP. Actions listed in the
                                                                                                                      plan to increased participation are underway, with
                                                                                                                      a focus on school age education and training.
                                                                                                                      Although currently on track, no TMR cycle grant
                                                                                                                      projects were included in the 2023/24 Financial
                                                                                                                      year, delaying the implementation of the NCWSIP.
                                                                                                                      plan roll out.

                                                                                                            Page 49 of 70
Log in to download the original file

2023-02-13 General Committee Meeting Agenda(PDF, 12MB).pdf · 12.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.