Building Envelopes
5. Other than the stormwater infrastructure and a pathway, strictly in accordance with that as
shown on the approved plans, all buildings, structures and infrastructure associated with the
future development of Lots 50 and 51 is to be confined to the building envelopes shown on
Plan No. C100, Plan of Reconfiguration and Key Elements prepared by Covey Associates
Pty Ltd, Revision B, dated 23 September 2024.
Stormwater Drainage
6. Stormwater runoff from the development must be disposed of on site without causing scour
or damage to the subject site or any adjoining property. The works must be in accordance
with the Stormwater Management Plan Revision C reference AG/AG/213029-LA prepared
by Covey Associates dated 4 October 2024. All works must be completed and certified by a
Registered Professional Engineer of Queensland (RPEQ) prior to Council approving the
plans of subdivision for Lots 50 and 51.
Services
7. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
8. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
9. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
approval and all applicable legislation at the time of construction.
Easements
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
11. Easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
12. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
13. All subdivisional works must be carried out in accordance with the recommendations
contained in the Geotechnical Investigation reference 22511-001-Rev 0 prepared by
Tectonic Geotechnical & Environmental Engineers dated 10 February 2023. All works must
be completed and certified by a Registered Professional Engineer of Queensland (RPEQ)
prior to Council approving the plans of subdivision for Lots 50 and 51.
*(Refer to Advisory Note)
Geotechnical Stability - Future Dwelling Requirements
14. All future dwellings on the approved lots must be sited and constructed in accordance with
the recommendations contained in the Geotechnical Investigation reference 22511-001-Rev
0 prepared by Tectonic Geotechnical & Environmental Engineers dated 10 February 2023
unless varied by a site specific investigation for a particular house lot.
To advise owners, prospective purchasers and building certifiers the following or similar,
notation will be added to Council’s rates records for the proposed lots.
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.