To ensure the geotechnical stability of the proposed lots are maintained, all buildings and
structures must be sited and constructed in accordance with the geotechnical conditions of
this approval.
Rehabilitation Works
15. The land area identified for rehabilitation on the Approved Plans must be rehabilitated in
accordance with the approved plans listed in this approval and removed of all weeds species
listed in the following standards and legislation:
a. an invasive plant as defined in Schedule 1 and Schedule 2 of the Biosecurity Act 2014
(Qld) and Schedule 4 of the Biosecurity Regulation 2016 (Qld);
b. an invasive plant as defined in Appendices 11.1 of the Noosa Biosecurity Plan 2020.
16. Rehabilitation works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this approval.
*(Refer to Advisory Notes)
17. The Rehabilitation supervisor must, during the maintenance period, annually:
a. Organise formal inspection with Council’s delegate*.
b. Submit to Council (with each inspection request) a Rehabilitation Status Report (written
and photographic), mapping:
i. The condition of the regeneration area.
ii. Detailing works undertaken in the previous year.
iii. The percentage cover of indigenous recruitment.
iv. Measuring the works against the conditioned Performance Criteria.
*(Refer to Advisory Notes)
18. The Performance Criteria for Rehabilitation works is as follows:
a. Year One – 12 months after acceptance of works On Maintenance:
i. Planted trees have achieved an average height of 1m.
ii. Planted shrubs have achieved an average height of 0.4m.
b. Year Two - 24 months after acceptance of works On Maintenance:
i. Planted trees have achieved an average height of 2m.
ii. Planted shrubs have achieved an average height of 1m.
c. Year Three – 36 months final acceptance of works for Off Maintenance:
i. Planted trees have achieved an average height of 3m.
ii. Planted shrubs have achieved an average height of 1.2m.
iii. Canopy and / or vegetative strata must not be devoid for any area greater than
1.0m2 within any 10m2 sample.
iv. Plant density shading out and/or self-mulching.
d. The duration of the establishment period:
i. Adherence to maintenance regime for rehabilitation and revegetation areas.
ii. No evidence of woody weeds reshooting from stumps, poisoned trees or the
regrowth of cut stumps.
iii. No evidence of over-weeding or impact on non-target species.
iv. Signs of indigenous recruitment in rehabilitation areas.
v. Weed infestations less than 5% of the rehabilitation areas.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.