Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Meyer Judgment Sealed

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

      Fauna Management
24.   Fauna or fauna habitat relating to minor approved tree removal/clearing works must be
      managed by a qualified person*.
      *(Refer to Advisory Note)

      FOLLOWING CONSTRUCTION
      Bonds
25.   Bonds must:
      a.    Meet the requirements of the relevant Council Planning Scheme Policy for performance
            and uncompleted works.
      b.    Be calculated using a schedule of works and relevant bond equation.
      c.    Include GST.
      d.    Have approval of the bond calculations and amount from Council, prior to lodgement.
      e.    Be lodged with Council and accompanied by the Bond Administration Fee/s.
      f.    Be requested for release by writing to Council when relevant approval requirements
            have been met.
26.   Performance Bonds must be lodged for:
      a.    Rehabilitation.
      On Maintenance
27.   Maintenance periods* must be:
      a.   36 months for Rehabilitation or subject to meeting final performance criteria.
      *(Refer to Advisory Note)
28.   Prior to the approval of the plans of subdivision for Lots 50 and 51 and requesting an On
      Maintenance inspection the following (prepared by respective qualified persons* and
      certifying compliance with approvals) must be submitted to Council:
      a.    Rehabilitation certification.
      Off Maintenance
29.   Prior to requesting an Off Maintenance inspection, the following must be provided:
      a.    Written request of bond release.
30.   Off Maintenance Inspection must be requested:
      a.    By contacting Council.*
      b.    Only after all works are confirmed in good order and in accordance with the approved
            plans and this approval.
      *(Refer to Advisory Note)

      Damage to Services and Assets
31.   Any damage caused to existing services and assets as a result of the development works
      must be repaired at no cost to the asset owner at the following times:
      a.    where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
            or
      b.    where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and assets
      must first be referred to the relevant service authority for approval.




                                                                                                       5
Log in to download the original file

Meyer Judgment Sealed.pdf · 22.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.