Skip to the record
Search everything, all in one place.

Original source · versioned page text

Meyer Judgment Sealed

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

     ADVISORY NOTES

     Construction Management Plan
1.   A Construction Management Plan must be submitted to Council prior to works commencing.
     The plan must address the following:
     a.   traffic management during all aspects of the construction phase including:
          i.     a Traffic Management Control Plan in accordance with the Manual of Uniform
                 Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                 control measures prior to construction.
          ii.    maintenance of safe pedestrian vehicle access for the areas affected by the
                 works during and after daily construction has ceased.
          iii.   proposed fencing to the site during the construction phase of the development.
          iv.    provision for worker car parking.
     b.   maintenance and protection of water quality and existing drainage lines through the
          construction site, through the implementation of appropriate erosion and sediment
          control measures.
     c.   works programme identifying key components of the works and their respective
          durations.
     d.   establishment of a communication protocol with the general public, adjoining owners,
          emergency services and local businesses to advise of agreed construction times,
          impacts on traffic, services and other relevant issues.
     e.   Include a post out to the local residents and businesses advising of the proposed
          development, the expected time frames and the site contact details.
     f.   Include signage in prominent locations on the boundaries of the site advising of the
          proposed development, the expected time frames and the site contact details.
     g.   identification of complaint management procedures including:
          i.     contact details for the on-site manager
          ii.    dispute resolution procedures
     h.   details on the location of external fill/dump sites/sources, the haulage route, type of
          vehicle to be utilised during filling operations and frequency of usage. NB any damage
          to the existing road system as a result of haulage operations shall be fully repaired at
          the applicant’s expense
     Qualified Person
2.   For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
     for the development, a qualified person is considered to be a person who:
     a.   is a Registered Professional Engineer of Queensland (RPEQ); and
     b.   has a degree in civil engineering or engineering geology; and
     c.   has a minimum of 5 years experience in the field of geotechnical engineering or
          engineering geology.
3.   Qualified Person, for the purpose of:
     a.   Supervising landscape works and preparing a landscape certification, is considered to
          be a landscape architect, landscape designer or horticulturist with a minimum of three
          years current experience in the field of landscape design.
     b.   Undertaking landscape construction and establishment works is considered to be a
          person with five years current experience in commercial landscape construction
          projects.



                                                                                                     6
Log in to download the original file

Meyer Judgment Sealed.pdf · 22.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.