Original source · versioned page text
Meyer Judgment Sealed
Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 68, section 1. The text section number identifies this passage in the reader.
tecténic PROPOSED RESIDENTIAL DEVELOPMENT geotechnical & environmental us 39 PICTURE POINT CRESCENT, NOOSA HEADS The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation of the proposed retention and subsurface drainage system. It will be necessary to conduct numerical analysis to optimise the retention system. Detailed design will also need to account for relevant factors of safety to maintain the temporary and long-term stability of the retention system. Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping backfill, will require engineer design and certification of construction. Retaining wall design should be carried out in accordance with AS4678-2002 Earth retaining structures. Design for temporary and permanent retaining structures could be carried out using a trapezoidal (for propped or anchored walls) pressure distribution applicable to the wall type and based on the parameters listed in Table 4. These values do not include allowance for hydrostatic pressures nor transient (e.g. construction) or adjacent footing loadings. Table 4: Retaining Structure Design Parameters Unit Lateral earth pressure coefficients Retained material weight Biletion (tim?) angle (°) Ka Ko Kp (Cantilever wall) | (Non-yielding wall) i Roose 1.7 28 0.36 0.53 277 Medium Dense Sands 1.8 34 0.28 0.44 3.54 me tor Denser) 1.9 36 0.26 0.41 3.85 Retaining structures must be founded as per the recommendations in Section 6.3.2 above with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed design must include an assessment of internal and global stability. A solution using screw piles to support retaining walls, possibly including raked piles, may be feasible although bending and shear capacities would need to be carefully checked in design from a soil-structure interaction viewpoint. Additional lateral capacity may be achieved by incorporating a deeper pile cap that also acts as a shear key attracting passive resistance from the sands in front of the wall. 6.5 Drainage Surface diversion drainage should be constructed above the crest of any new cut or fill embankment or retaining walls (e.g. grassed or landscaped swales or diversion mounds). Adequate site drainage must be installed to ensure that stormwater runoff is directed away from building walls, footings, batters and retaining walls. Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified to assess the impact on stability. Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site- specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be accounted for in the design of the retaining structure. All excess stormwater collected around the residence (including overflow from rainwater tanks etc.) must be directed by pipes or lined channels to the nearest legal point of discharge. Where possible, excess stormwater collected from the roof and other elevated hard surfaces should be piped to discharge into the kerb along Picture Point Crescent. Given the relative elevations involved, the use of a ‘wet’ or ‘charged’ drainage system may be required. Where this can only be designed to take some flows; smaller volumes of excess stormwater will need to be directed to the dune slope to the north 10 February 2023 Report No. 22511-001-Rev0 16 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.