Original source · versioned page text
Meyer Judgment Sealed
Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 67, section 1. The text section number identifies this passage in the reader.
tecténic PROPOSED RESIDENTIAL DEVELOPMENT geotechnical & environmental a 39 PICTURE POINT CRESCENT, NOOSA HEADS All footings should found such that they are not adversely affected by any adjacent excavations, trenches, retaining walls, or in ground structures that are not designed to support building loads. Footings should found at least below a plane extending 1 m horizontally from the base of trenches/excavations/retaining walls/swimming pool, then rising up at 1V:1H, as illustrated in Text Figure 10. J TRENCH BACHFILL Text Figure 10: Footing depth recommended to minimise risk of undermining Site drainage should be designed to readily remove surface water and to prevent ponding of water on subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction is completed. It is recommended that footings be inspected by a suitably qualified and experienced RPEQ prior to placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and cleanliness of excavations. If any soil conditions encountered during construction are found to differ from those noted in the geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to determine if changes to footing design are required. 6.4 Temporary and Permanent Retention Excavations are expected to range up to around 3 m to 4 m BGL (existing ground levels) and, given that the planned excavation extends close to some of the site boundaries and underground infrastructure (e.g. sewer), some form of temporary shoring will likely be required to support the excavation(s). Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by use of sheet piles, however Unitywater requirements for the sewer may restrict the use of sheet piles. Shoring of deeper cuts would likely require lateral restraint, and this is conventionally achieved by helical steel anchors (similar to screw piles). However, the proximity to neighbouring properties would require permissions to be obtained for subterranean access. Therefore, where lateral support by cantilever only is not feasible, it is suggested that internal struts/propping be considered to provide lateral restraint for the shoring system. Anchored or propped sheet piles may require pre-drilling in dense sand materials to prevent adverse vibrations during sheet pile installation. Other shoring methods that could be considered include bored contiguous or secant piles. Non-contiguous or soldier pile walls are not feasible for the proposed development due to the likelihood that loose sands would ‘flow’ through gaps between the piles. An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the permanent walls, whereas sheet piles would be temporary to provide retention during construction only, therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require greater width (horizontally) for installation as compared to sheet piles and are often more expensive. 10 February 2023 Report No. 22511-001-Rev0 15 66
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.