Original source · versioned page text
2015-04-28 Planning and Organisation Committee Agenda
The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
Figure 3 – Cut and Fill Plan Extract
A 10m setback to vegetated riparian areas is proposed, with a substantial stormwater
detention basin included in this area.
1.2. Supporting Documents
The application material includes specialist reports and supporting documents, comprising:
Planning Report
Urban Design Report and Landscape Concept
Economic Impact Report
Civil Engineering Report
Stormwater Management Plan
Acoustic Assessment
Ecological Assessment
Traffic Report
Page 12 of 211
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.