4.2.1.3. MUSIC modelling results
The proposed treatment train for each site can achieve the required water quality improvements as
shown below in Table 4.3 - MUSIC Modelling results.
Table 4.3 - MUSIC Modelling results.
Pollutant Sources Residual Percentage Percentage
Load Target Reduction
Total Suspended Solids (kg/yr) 479.402 75.52 80 84.247
Total Phosphorus (kg/yr) 1.042 0.248 60 76.17
Total Nitrogen (kg/yr) 6.637 2.514 45 62.119
Gross Pollutants (kg/yr) 62.163 0 90 100
4.2.2 Operational Maintenance
Periodic maintenance and monitoring of the bioretention area proposed for this development shall
be carried out to ensure it is operating effectively during the operational phase. The responsibility
for these maintenance activities shall be the body corporate or owner of the site.
The bioretention areas shall be maintained following a schedule of routine inspections undertaken
after every significant rainfall event (30mm of rainfall in a 24-hour period) or on a three-monthly
basis within the first twelve months and on a six-monthly basis thereafter. The inspection shall
ensure the proper functioning and condition of the bioretention area and ensure that the planting
and vegetation health is suitably maintained. An inspection checklist from the Healthy Waterways
Technical Design Guidelines for Southeast Queensland has been provided in Appendix
Bioretention Inspection Checklist that provides the structure for the inspections to be undertaken.
In addition to regular inspections, the first 4 months of establishment of the bioretention areas
requires a watering frequency of:
i. Week 1 - 6: 5 times per week
ii. Week 6-10: 3 times per week
iii. Week 11-15: 2 times per week
After 5 months, watering frequency shall be adjusted based on the local conditions to ensure plants
are maintained in a healthy state.
Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 21 of 27
Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - 20210153 Maple St SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.