CONCLUSION
This Concept Stormwater Management Report has outlined how the stormwater run-off from the site
is to be managed to comply with the relevant requirements and minimise any adverse impacts to the
downstream catchments.
• The existing site surface run-off drains overland as well as within a drainage network
discharging to the verge on Myall Street as the lawful point of discharge. The proposed
development will maintain Myall Street as the lawful point of discharge, with run-off from the
site discharged into the existing drainage system on Myall Street.
• The existing and proposed development site have been modelled for the design storm
events applicable to the site, which found attenuation would be required to ensure no
increase to peak run-off generation rates. Provision of a 50kL attenuation tank with a 55mm
low flow orifice, and the proposed bioretention garden was found to provide suitable
mitigation to the development to ensure that there will be no increase to existing peak flow
discharges from the site for any of the storm events. Including the upstream external
catchment, the results demonstrate and improvement will be achieved within the state
controlled Myall Street.
• Rainwater reuse storage is provided at a minimum rate of 3,000L/unit. A total of 50kL of
rainwater storage will be provided to meet the outcomes of the sustainable building code.
Rainwater reuse is to be plumbed into non-potable demands throughout the site including
in external irrigation and wash down areas, and internal toilets and laundries. The tank will
be fitted with an automatic switching device to revert to town water supply where insufficient
water is available for reuse.
• During construction, erosion and sediment control measures are to be implemented to
minimise potential contaminants impacting the downstream receiving environment in
accordance with Appendix 2 of the SPP. An erosion and sediment control plan shall be
developed as part of a submission for Operational Works approvals.
• In the operational phase of the development, a stormwater treatment train will provide
quality improvements as required by the Noosa Council Planning Scheme Policy. Roof run-
off from the new buildings will be captured in rainwater tanks reuse in non-potable demands.
Run-off from the ground surfaces will be captured by an internal drainage line to be conveyed
through the site. All run-off from the site will be conveyed to an end of line bioretention
garden along the southern boundary providing treatment for flows before they are
discharged from the site.
By implementing the proposed stormwater treatments, the development will reduce the
quantity of stormwater pollutants by more than 90% of gross pollutants, 80% of total
suspended solids, 60% total phosphorous and 45% total nitrogen, exceeding the pollutant
reduction targets required for the site.
• The proposed stormwater solution is considered to minimise any adverse impacts to the
downstream environment arising from the stormwater run-off while also meeting the
stormwater quality targets required for the development.
Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31 Page 22 of 27
Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - 20210153 Maple St SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.