Original source · versioned page text
2014-04-28 General Committee Meeting Agenda Pages 65-200
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
Page 127 of 200
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014
Noosa Council
Capital Works Schedule
As at 31-Mar-2014
Noosa District Sports Complex - Stage One - redevelop crick 30,000 30,000 1,838 6.13%
Total Sports Ground and Facilities 30,000 30,000 1,838 6.13%
Stormwater Drainage
Daintree Estate - Flood Mitagation Planning and Design 50,000 50,000 6,089 16.18%
Gympie Terrace Pipe Rehabilitation - Investigation & Design 25,000 25,000 7.663 30.65%
Rifle Street Pomona - Flood Mitigation Planning and Design 50,000 50,000 747 149%
Seaview CK - open drain civil works 25,000 25,000 2,691 10.76%
‘Stormwater replacement program (non pipe work) 75,000 75,000 54,364 72.49%
Total Stormwater Drainage 225,000 225,000 73,554 32.69%
Streetscapes and Road Corridors
Forward Planning for Streetscape and Road Corridor improveme 50,000 50,000 2,046 4.09%
Total Streetecapes and Road Corridors 50,000 50,000 2,046 4.039%
Transport and Infrastructure Management
Eenle Creek Road / Langura Street intersection safety upgrad 8,000 8,000 0 0.00%
Eente Creek Road / Walter Hay Drive Intersection safety upgr 15,000 15,000 0 0.00%
Weyba Road Reef Street intersection Improvements - PIP 125,000 125,000 574 045%
Total Transport and Infrastructure Management 148,000 148,000 574 0.39%
Grand Total 5,704,000 5,704,000 2,568,852 45.04%
Page 127 of 200See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.