Original source · versioned page text
SCG 31131-OPW-2022.05.19-Issue 2.pdf
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — At
www.dialbeforeyoudig.com.au
SAY DIAL1100
yy BEFORE YOU DIG
HEIGHT DATUM
Lot 1 on RP130594 & Lots 80 &
81 on RP71151
Level Datum AHD I
Level Origin PSM115316, RL 3.593m
Survey information provided by Noosa
Cooloola Land Surveys Pty Ltd |
Drg No. 21215DET
EXISTING CONDITION SURVEY
A PHOTOGRAPHIC SURVEY OF THE EXISTING KERB &
CHANNEL AND FOOTPATHS FRONTING THE SITE IS TO
BE COMPLETED AND ISSUED TO COUNCIL PRIOR 10
THE PRE-START WORKS MEETING WITH COUNCIL.
LEGEND
_--777 INDICATES EXISTING SURFACE CONTOURS
07 AND LEVELS TO AHD.
400 EXISTING SURFACE SPOT LEVELS.
— ——— INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
w———— INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS
a INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS
EXISTING SIDE ENTRY PIT
PROVIDE FILTER SOCK
SURROUND DURING SITE
BULK EARTHWORKS.
—— — — site
— SWALE —>
BUNDING TO DETAIL
i (.-0)
PARKING AREA FOR
INDICATES STORMWATER DRAIN EXISTING
AS NOTED
INDICATES DIRECTION OF SURFACE FLOWS
SILT RETENTION FENCE TO DETAIL
INDICATES ALIGNMENT OF SWALE AND
DIRECTION OF FLOW, REFER TYPICAL
SWALE DETAILS
INDICATES ALIGNMENT OF SOIL BUNDING
MOUNDS TO DETAIL. SITE FOREMAN TO
MAINTAIN BUNDS THROUGHOUT WORKS
INDICATES LOCATION OF COIR LOG CHECK
DAMS ACROSS DRAINAGE PATHS REFER
TYPICAL DETAIL
FOR-DELIVERY'S DURING
CONSTRUCTION. TYPICAL.
VISITORS AND WORKERS
a= BLOCKWORK WALLS FOR DETENTION CONSTRUCTED SEDIMENT
ae ZONE AND BIO-RETENTION BED BED TO DETAIL MIN 80m2
ee ear . CONSTRUCTED TO CREATE PLAN SIZE, OUTFLOW TO
Wes a SSS 22577 SILT/SEDIMENT SETTLEMENT BED TO EXISTING SITE DRAINAGE
a= x _ x 87 SERVE SITE THROUGHOUT GULLY PIT, REFER DRG
ae x CONSTRUCTION WORKS. PROVIDE GAPS QW2.2 FOR BED DETAILS
wad \ | | R| IN WALLS TO ALLOW SURFACE RUNOFF
\ INFLOWS INTO THE BED. REFER DRG
\ x a SW1.1/SW1.2 FOR DETAILS
x : SILT FENCES TO DIVERT
' \ FLOWS INTO CONSTRUCTED
MAINTAIN EXISTING SITE TURFED AREA FOR A SILT DETENTION BASIN.
\ \ BUFFER. PROVIDE MAXIMUM POSSIBLE WIDTH. PROVIDE
\* \ BARK CHIP REPLACEMENT FOR ANY EXPOSED SOIL AREAS.
\ \ PROVIDE SILT FENCE ACROSS THE UPSTREAM EDGE OF
- THE ZONE DURING THE CONSTRUCTION PHASE OF
BIO/DETENTION BED AND SILT/SEDIMENT BASIN
THE SILT FENCE ALONG THE NORTHERN \ _—— _ ‘ :
BOUNDARY TO BE COVERED WITH BUILDERS | —* —=SILT
‘ \
\ _ OSL
CREATE A VEHICLE PATH THROUGH ° . (c.-0) _
THE’ SITE FOR SONSTRUCTION ¢ ~— 5
VEHICLES, COVER YN CRUSHED ROCK = a ters
OR ROAD BASE =| SL. _- — —— 7 Y ~
TEMPORARY SWALE CONSTRUCTED TO
% DIVERT SURFACE FLOWS PRIOR TO
BUNDING TO DIVERT FLOWS
INTO CONSTRUCTED
DETENTION BASIN.
wwe ‘
$10 Sogu/eX—
(Ue
0% BUNDING CONSTRUCTION
“ee . \ ‘ swh73,976 sr
PROVIDE RUMBLE GRATES = \% . \ ) * :
DURING DEMOLITION & 6 \ J\
SITE BULK EARTHWORKS. \
ee *e \ \ Sows. Manhole ¢
+ o\ e
Sw \ . \ + A
= —— \ \ Yn
; SS \ , ‘
\ \ m
\. “® \. | SITE SILT & SEDIMENT MANAGEMENT — CONSTRUCTION PHASES
ar \ * h PHASE METHODOLOGY
xX oN . DEMOLITION — Provide silt fencing around existing SW pit in N.E. Cnr of site
a ‘ N\ \ 2 - Construct bunding along rear (eastern) boundaries as indicated on plan.
\ & ‘ an Lot 4 CHR Cover bunds in builders plastic to prevent scour/silt runoff
SS * \ \ ae130oy4 — Maintain the existing turfed area shown on the plan and provide
oN \ a additional silt fence upslope from the area.
: N \ F & — Install remaining silt fences as indicated on the plan.
SS N y NL — Rumble grates and no fines rock hardstand to be provided for all plant
> \ N A and equipment exiting the site.
* NS y ° NS ¥ — Cover all stockpiled soil with builder plastic
\ yY e \ S — Maintain existing swale adhjacent northern boundary and install coir log
\ * oy dams along its length
an \
N + > BIO/DETENTION/SILT | — Maintain all site measures implemented during the DEMOLITION phase.
. \ \ N _ a As CONSTRUCTION BASIN] - Fix and or improve any measures damaged or compromised during the
Y \ $ ~ — SILT aa DEMOLITION phase or past storm event.
SILT FENCING. AROUND S a i — | — Provide a clearly identified vehicle path through the site down to the
s ~~ s \L ee ~ construction work-face. Provide crushed rock/road base as a temporary
PARKING AREA ~ N > — SI ~~ / Xi pavement along these paths.
— Establish a clearly identified parking area within the site for workers and
visitors. This area should have crushed rock/road base surfacing and the
downslope areas surrounded by silt fencing.
EXISTING SITE DRAINAGE GULLY PIT PROVIDE
SILT BARRIER SURROUNDS DURING
CONSTRUCTION OF DETENTION BASIN
PLASTIC TO DIVERT ALL FLOWS TOWARDS AND | eT RETANNG WALLS. FULL INFLOW CAPACITY TO
INTO THE INTO CONSTRUCTED DETENTION BASIN. | oo 316 q(\— ene) WORKS
FENCE TO BE MAINTAINED THROUGHOUT 0! 282" = SI ER SL SIL
Vx 4910.00 — asic 0
CONSTRUCTION a — — eguunets Pl (c.-0)
lx & “i iy | WALE N) \ gWwALE oe
~ _ = ==SILF + ie FORMATION Wale > \\— 5 ( 489)
a . EXSING SEE Lot S61
xy ts | vd RP
+ NE 2
; _ a SILT : | oN \\ 2 S ff ey SLOTTED 150 DIAM PIPES
oe \ es | a: | Ly AT 1.5m CTRS WITH 225
RP ROUNDARY <T we) | _— SWAe (ao) \ il f? : DIAM MANIFOLD CONNECTING
= SN oer out wale \ PIPES TO EXISTING PIT,
— pLASTC 0 ( ie-A\ ~ \ a REFER DRG OW2.2 FOR BED
ne — (puuDers _— sw (cl-0) \ {f So a °
E> f . DETAILS
\ _—— swr 11 Field intet \ &
gWAE A7 é
80-120mm ROCK (NO FINES) . \ .
HARD STAND OVERLAY : \
MAINTENANCE OF SILT PROTECTION
SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT
PROTECTION MEASURES THROUGHOUT THE DURATION OF
PROJECT. ANY BREACHING OF THE PROTECTION MEASURES
MUST BE REMEDIATED IMMEDIATELY AND REPORTED TO THE
ENGINEER FOR CORRECTION MEASURES. SILT RUNOFF
PROTECTION IS TO BE MAINTAINED UNTIL SUCH POINT THAT
LANDSCAPING IS COMPLETED AND NOT SUSCEPTABLE TO
STORMWATER SCOUR.
DUST MOBILISATION FROM WIND ACTION
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF STOCKPILES
SITE DRAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE
ARE TO BE COVERED UNTIL THE SITE IS COMPLETED
OR TO BE FITTED WITH SILT PROTECTION MEASURES
TO THE APPROVAL OF THE ENGINEER
BULK EARTHWORKS | — Maintain all site measures implemented during the previous construction
phase.
— Fix and or improve any measures damaged or compromised during the
previous phase or past storm event.
— Provide all detailed items within the constructed Bio/Detention basin
which will act as the a Silt Basin during the earthworks and subsequent
construction phases.
— Ensure all site surface runoff is channeled through the Silt Basin. No
runoff from the site must be allowed to drain into neighbouring properties.
— Maintain bunding where required
— The Silt Basin will require continual management/maintenance during the
remaining construction works. Refer Silt Basin detail.
— Approved flocculating agent should be used for any silt laden volumes
of detained runoff within the Silt Basin.
— Stripped Areas awaiting earthworks should be tilled or bucket raked in a
direction parallel to the surface contours to slow/impede surface runoff
and promote infiltration
— Completed earthworks areas should be treated with an approved soil
binder material.
SITE PLAN _= SILT & SEDIMENT EROSION PLAN BUILDING WORKS — Maintain all site measures implemented during the previous construction
Scale 1: 200 phase.
cae — Fix and or improve any measures damaged or compromised during the
9 2 a 6 8 19.4:200 @ Al previous phase or past storm event.
1:400 @ AS — The Silt Basin will require continual management/maintenance during the
remaining construction works. Refer Silt Basin detail.
— All constructed SW pits within the site must be covered until connected
to drains which discharge in the Silt Basin. At which point the pits should
still be covered with a Geofabric blanket.
— All installed gutters should be fitted with temporary down pipes which
drain directly into constructed SW pits.
BIO-RETENTION BED | — The silt capture measures shall be removed from the Silt Basin for
preparation of Bio—retention basin.
— The Bio-retention basin shall be constructed in accordance with the
details contained within these drawings.
These measures are provided with reference to IEAUST Soil and Sediment Erosion Engineering
Guidelines for Queensland Construction Sites
A Revisions for Council RFI 19.05.22
Revision | Description Date
“FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
f Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 299
DEBUILD T/A
Title:
SITE SILT AND SEDIMENT
CONTROL
Project
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: Drawn Design
April 22 SR SR
Checked: Drg No. Rev.
| 9.55 | 31131 -OW2.1| A.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131-OPW-2022.05.19-Issue 2.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.