Original source · versioned page text
SCG 31131-OPW-2022.05.19-Issue 2.pdf
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — At
www.dialbeforeyoudig.com.au
SAY DIAL1100
yy BEFORE YOU DIG
900(W) GEO-FABRIC SILT FENCE,
FIXED TO SPIKES AND BURIED ——-
300 INTO STABLE GROUND.
SILT
IS TO
1200(L) 50 SQ. HDWD
SPIKES, 1800 CTRS DRIVE
600 INTO GROUND.
RETENTION
THE CONTRACTOR IS TO INSTALL APPROVED
SILT RETENTION FENCES PRIOR TO
COMMENCING ANY EARTHWORKS. THE FENCE
BE CONSTRUCTED ALONG THE
LOWEST BOUNDARY AND RETURNED UP SIDE
BOUNDARIES TO ENSURE FULL STORMWATER
ENTRAPMENT. SURFACE RUNOFF FROM
WITHIN THE ALLLOTMENT MUST DRAIN
TOWARDS THE FENCE AND SHALL NOT
ENTER NIEGHBOURING ALLOTMENTS
THROUGH THE USE OF SURFACE BUNDING
SILT FENCE DETAIL OR SCOUR PROTECTED DRAINS. THE FENCE
MUST
THAT
REMAIN IN PLACE UNTIL SUCH TIME
FINISHED LANDSCAPING AND
DRAINAGE MEASURES ARE INSTALLED.
EXISTING STORMWATER
INLET
PROVIDE SILT FENCE AROUND
INLET AS PER DETAIL ON THIS
SHEET.
PROTECTION OF EXISTING STORMWATER PITS
SILT/SEDIMENT BASIN MANAGEMENT
—The site foreman shall monitor and maintain the silt basin
throughout the works.
—Any trapped silt after storm events should be removed and the
protection measures maintained/reinstated to as built condition.
— The geofabric blanket should be removed and replaced after
substantial storm events.
— Trapped/detained silt laden stormwater can be flocculated with an
approved flocculating agent.
— Any breaching or overflow incidents should be reported immediately
to the Civil Engineer
RAISE EXISTING PIT INFLOW LEVEL
IF REQUIRED TO ACHIEVE
SETTLING DEPTHS, PROVIDE SILT
FENCE SURROUND
SLOTTED PIPES AS
NOTED ON PLAN, SINGLE
CONNECTION POINT T
EXISTING SW PIT
DETENTION BASIN
PERIMETER BLOCKWALLS
CONSTRUCTED FIRST TO
ESTABLISH THE
SEDIMENT BASIN
GEOFABRIC_BLANKET
A34 BIDIM NON-WOVEN
Flow Rate @ 100mm head : 165Lt/m?/s
Pore Size : 75 Microns
Inflow Capacity @ 80m? ; 1300Lt/s
(GEOF ABRICS.COM.AU)
BASIN OUTFLOW CAPACITY
Bidim Capacity @ 80m? ; 1300Lt/s
225¢ PIPE ; 50-60Lt/s
SEDIMENT SETTLING POND MIN 80m” PLAN AREA
20-40mm GRAVEL OVERLAYING THE SLOTTED
PIPES, OVERLAY GRAVEL WITH GEOFABRIC BLANKET,
EXTEND UP EDGE BERMS & PIN TO GROUND,
BUILDER TO REPLACE GEOFABRIC AND REMOVE
CAPTURED SILT AFTER STORM EVENTS OR AS
REQUIRED.
SEDIMENT
SETTLING ZONE.
PROVIDE GAPS IN BLOCK
WALLS TO ALLOW
INFLOW INTO BASIN
ones
OUTFLOW FROM PIPES
DIRECTED TOWARDS
EXISTING SWALE DRAIN
TYPICAL SECTION SILT/SEDIMENT BASIN
COIR LOGS STAKED ACROSS SWALE/DRAIN AND
EXTENDED BACK UP FLANKS TO RESTRICT FLOW
AROUND DAM EDGES. BUILDER TO ADJUST EXTENT
OR Ht OF DAM IF FLOW AROUND OCCURS. PROVIDE
LOOSE COBBLES ACROSS UPSTREAM EDGE OF LOG
TO AVOID UNDER FLOW
yyw
EXTEND BACK UP FLANKS ff ,
TO RESTRICT FLOW PROPOSED SWALE
AROUND DAM EDGES. voy OR TABLE DRAIN
COIR LOG CHECK DAM DETAIL
EXISTING SIDE ENTRY SILT FILTER SOCK TO
PIT OR SIMILIAR SURROUND GRATES AND
GRATED PIT SIDE ENTRY INTO PIT
KERB & CHANNEL
SILT FILTER SOCK DETAIL — STAND UP KERB
COMPACTED SOIL BUND TO
MINIMUM DIMENSIONS NOTED,
COVER IN BUILDERS PLASTIC
AND PIN SECURELY TO
GROUND
a
SURFACE BUNDING DETAIL
PROVIDE CHECK DAMS AS
1000mm MIN DETAILED
2
SY |
™——™ ON
“NNT [~~
TYPICAL SECTION CUTOFF SWALE
MAINTENANCE OF SILT PROTECTION
SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT PROTECTION
MEASURES THROUGHOUT THE DURATION OF THE PROJECT. ANY
BREACHING OF THE PROTECTION MEASURES MUST BE REMEDIATED
IMMEDIATELY AND REPORTED TO THE ENGINEER FOR CORRECTION
MEASURES. SILT RUNOFF PROTECTION IS TO BE MAINTAINED UNTIL
SUCH POINT THAT LANDSCAPING IS COMPLETED AND NOT
SUSCEPTABLE TO STORMWATER SCOUR.
DUST MOBILISATION FROM WIND ACTION
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE CARRIAGE OF
SOIL SEDIMENT FROM WIND ACTIONS. SITE FOREMAN TO COVER ALL
STOCKPILES WITH HESION OR SIMILIAR, PROVIDE SILT FENCING
AROUND BASE OF STOCKPILES
SITE DRAINAGE — CONSTRUCTION
ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS
TOWARDS THE CENTRE OF THE ALLOTMENT THEN TOWARDS
THE REAR BOUNDARY WHERE RUNOFF WILL DRAIN THROUGH
THE SILT POND & SILT FENCES. IN NO INSTANCE SHALL
THE ALLOTMENT DRAIN INTO NEIGHBOURING ALLOTMENTS.
SITE DRAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE
ARE TO BE COVERED UNTIL THE SITE IS COMPLETED
OR TO BE FITTED WITH SILT PROTECTION MEASURES
TO THE APPROVAL OF THE ENGINEER
Revision | Description Date
“FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
aN Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 299
DEBUILD T/A
Title:
SILT AND SEDIMENT
CONTROL MEASURES
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: Apri 22 Drawn SR Design SR
1:200 @ AI §
nae F111 400 @ AS |S Rehodon |) | 01131 -OW2.2
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131-OPW-2022.05.19-Issue 2.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.