11.

12.

13.

14.

15.
16.
17,

18.

19.

20.

21.

22.

So.

  

Sr entanug
gZ

»

So Z
= ZB
$ Z,
= B

we iy
7

There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall unless all switches and power outlets are positioned above the 1%AEP
flood level.

Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.

Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:

a. Located clear of this rock protection where applicable, or alternatively
b. Where the scour protection extends beyond 750mm:

i. Prior to driving piles, the rocks are to be removed to expose the geotextile and
the geotextile cut neatly to allow it to be turned back. During pile driving, care is
to be taken to ensure the geotextile is not damaged. At the completion of pile
driving, the fabric is to be turned down around the pile and the rocks replaced
around the piles

The jetty is to be used for private purposes only with no commercial operations to be
undertaken.

Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.

The mooring facility must not be utilised for live-aboard purposes, including short-term
accommodation.

Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.

Certification by a Registered Professional Engineer of Queensland that states that the jetty is
constructed in accordance with best practice methods and is structurally sound must be
submitted to Council. This certification must be submitted to Council within three (3) months
of the completion of the works. A final inspection and approval of the structure by Council’s
Inspector is also required. Please contact Council’s Development Assessment Branch on 5329
6500 to arrange the inspection.

This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by Council
for an extension.

After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans

Performance Bond

Security in the form of a cash bond or trading bank guarantee to the sum of $2500 must be
submitted to Council, to secure performance of all conditions of this approval, prior to
commencement of works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.

ADVISORY NOTES

he following notes are included for guidance and information purposes only and do not form part

e assessment manager conditions:

   
Log in to download the original file

Court Judgement 10 Jun 2021 - Case 209 of 2020.pdf · 436 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.