                                                                                                                                                                                      18



   significance; and                                       OR
d) Service and utility uses, including electricity         S5.3 Where located in a High or Medium Bushfire Hazard
   substations, major electrical depots and water          Area identified on Overlay Maps OM1.4 to OM9.4, uses are
   treatment plants.                                       designed to function effectively during and immediately after
                                                           bushfire eventS40.
Hazardous materials                                        S6.1 Hazardous materials are not manufactured and stored
06Public safety and the environment are not                on the site.

adversely affected by the detrimental impacts of
bushfire on hazardous materials manufactured or
stored in bulk.


13.34 Siting, design and construction
07 Uses and works including building works are             S7.1 Uses and works including building works are sited-
sited, designed and constructed to-                        a) on lots greater than 2500m2;
a) minimise the number of people and property                 i) in locations of lowest hazard within the lot (Figure
   subject to bushfire risk; and                                   13.5 provides guidance); and
b) maximise the protection of people and property             ii) to achieve setbacks from hazardous vegetation of 1.5
   during the passage ofa fire front.                              times the predominant mature canopy tree height or
                                                                   10m whichever is the greater; and
                                                              iii) 10m from any retained vegetation strips or small
                                                                   areas of vegetation; and

                                                              ivy so that the elements of the development least
                                                                   susceptible to fire are sited closest to the bushfire
                                                                     hazard;
                                                           b) on lots 2500m2 or less       -
                                                                                               to maximise setbacks from
                                                              hazardous vegetation37


13.35 Water supply_ for fire fighting
08An adequate and accessible water supply is               S8.1 For premises not in a water service area-each lot has         The site has adequate reticulated water supplies for
provided for fire fighting purposes.                       an accessible dam,    swimming pool or water tank accessible       fire fighting activities.
                                                           by the fire brigade that contains at least 5000 litres of water.

13.36 Vehicle access and fire trails
Firebreaks and fire access tracks                          S9.1 Firebreaks are provided by-                                   The site is located in a developed residenital street
09Firebreaks or fire access tracks proVide-                a)   a cleared road reserve not less than 20m wide located         with sufficient access for emergency vehicles.
a) adequate       access   for fire   fighting and other        around the perimeter ofthe development;
    emergency vehicles; and                                OR
bl adequate width      to minimise the risk of fire        b) fire    access    tracks between     the development and

Used in these records

About this file

File size
27.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 3 Report MCU13_0106.pdf · 27.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.