Development Application Part 2 of 3 Report MCU13/0106
Very large file (27.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
17
events-
a) Emergency service facilities; OR
b) Hospitals;
c) Education Type 4 uses, including stores for S3.2 The community infrastructure development-
valuable records or items of historic or cuftural a) does not resuft in any new building work other than an
significance; and addition to an existing building;
d) Service and utility uses, including electricity b) does not involve vegetation clearing; and
substations, major electrical depots and water c) does not after ground levels or stormwater conditions;
treatment plants.
OR
S3.3 The development includes measures that ensure-
a) the long term stability of the site;
b) access to the site will not be impeded by a landslide
event; and
c) the community infrastructure will not be adversely
affected by landslides originating on sloping land above
the site.
Table 13.9 Bushfire hazard areas37
Specific Outcomes Probable Solutions Assessment Compliance
13.33 Effects of use and works
New Uses
04 The proposed use does not compromise the 54.1 The use is sited on land that is not in a Medium or High The site is determined as low bushfire risk as
safety ofpeople or property from bushfire. Bushfire Hazard Area38; determined by
OR
S4.2 The use is sited on land that is determined as low
bushfire risk by a site specific bushfire hazard assessment.39
Protection of Infrastructure and Community Uses
05 Community Uses and Infrastructure Uses, S5.1 Community Uses and Infrastructure Uses are not
including that identified below, are able to function located in a High or Medium Bushfire Hazard Area identified
effectively during and immediately after bushfire on Overlay Maps OM1.4 to OM9.4;
events-
a) Emergency service facilities; OR
b) Hospitals;
c) Education Type 4 uses, including stores for S5.2 Building work will not involve more than an additional
valuable records or items of historic or cuftural 20m2of gross floor area to an existinq buildinq;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 3 Report MCU13/0106Related documentApplication case desk ↗
About this file
- File size
- 27.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.