7
Job No. ME13/018
Cuts supported by retaining walls will range up to about 2.0m beneath the house to form the
ground floor level at about RL 19.0m and about 1.0m for the front entry floor at approximately
RL22.6m.
Establishing adequately designed, constructed and maintained surface and subsurface
drainage as well as adopting suitable footing systems founding in competent subsurface
materials at depth is critical to the long term performance of the site in terms of slope stability.
Disturbance or removal of the dense vegetation from the steeper portions of this site can
cause instability in the form of slips, slumping, erosion and creep movements as this
vegetation provides additional support to the slopes. Where appropriate, natural vegetation
must be retained and cleared areas must be kept small and immediately revegetated after
construction where appropriate, to minimize the potential for instability and future erosion.
Suitable footing systems, founding within medium dense sandy soil at depth, will also
minimize the potential for stability problems within and around the building footprint. The
proposed development is not expected to impact on the stability of the Site or neighboring
property and infrastructure if the recommendations presented within this report are followed.
5.2 Excavations
An entry floor pad level of RL 22.6m is proposed which will require a maximum cut of
approximately 1.0m in the south west corner of the building pad.
Cut earthworks will also be required for construction of the ground floor pad at RL 19.0m.
Maximum cut depth is estimated at about 2.0m. Supplied design drawings indicate support of
the cuts using reinforced masonry walls. Batter angles approaching 30 degrees in
unvegetated sandy soils for cuts and fills at this site are considered inappropriate as a long
Battered slopes, particularly unvegetated battered slopes at this
term soil stability solution.
site, should be no steeper than 22 degrees or 2.5(H): 1 (V) and revegetated or protected
against erosion (eg erosion protection matting) as soon as practical to provide long term
slope stability.
Limited information was made available regarding the existing development to the south of
the site which comprises a concrete split level residence. With the proposed buffer zone
between the neighboring dwelling and proposed excavation for the ground floor on this site
approaching 2.0m, the southern face of the excavation may require the construction of a
retaining structure to prevent potential undermining of neighboring structures, including the
boundary walls, or neighboring soil loss in the event of a landslip. The adopted system may
require consideration of the loads from the footings and walls of adjacent structures, which
are immediately adjacent to or on the south boundary. The footing types, founding depths
and loads of footings supporting the adjacent buildings are not known. A suitable temporary
retaining system for the ground floor slab should be configured to enable the ground surface
behind the temporary structure to be left undisturbed whilst construction of the permanent
retaining system takes place in front of the wall. After construction, the void space between
the two walls is filled using engineered fill compacted to 95% SMDD or not less than 70%
Density Index and revegetated as soon as possible. The temporary retaining wall is then
removed or it can remain in place.
A suitable temporary retaining structure may comprise:
. Post and panel wall construction
. Driven sheet piles
The neighboring site to the north is undeveloped. Cut excavations to approximately 1.0m for
the proposed new development will encroach within 0.5m to 1.0m of the neighboring
boundary. Due to short buffer distance between the excavation face and the neighboring
boundary, temporary soil retention using a physical structure is encouraged to prevent
potential soil loss on the neighboring property, alternatively the construction of the proposed
permanent retaining wall using a "hit and miss" sequence could be considered whereby:
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 3 Report MCU13/0106Related documentApplication case desk ↗
About this file
- File size
- 27.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.