8
Job No. ME13/018
.
post holes are drilled at appropriate centers along the alignment of the wall to socket
below the proposed excavation base (in accordance with detailed design)
. Install and secure (concrete) the post into the drilled holes extending up to final
ground surface.
. Excavate vertically between posts in a "hit and miss" sequence, installing panels
between posts before moving on to the next section.
The buffer zone between the proposed development and the east and west boundaries of the
site are considered adequate to provide minimal risk to upslope and downslope infrastructure
in the event of a short duration event such as a surficial landslip. Here excavations can
proceed unsupported at a maximum slope of 30 degrees with erosion matting being fixed
over the cut surface for the duration of construction. Some minor surficial instability can be
expected, particularly after rainfall but this will be contained within the development envelope
and be of nuisance value rather than a risk to personnel and equipment. Rapid construction
of the retaining walls after cutting and staggering of the construction Le. where a sensible
portion of the cut is excavated (eg. 5m section) and wall installed prior to moving on to the
next section of cut is encouraged. Any fill placed behind retaining walls must be engineered
structural fill compacted to 95% SMDD or not less than 70% Density index.
6.0 RECOMMENDATIONS TO REDUCE HAZARD RATING
The following risk reduction strategies, in conjunction with the general Guidelines for
Development described in Section 7.0 below, must be followed to reduce the risk level
implication posed to the residential development to a Low level of risk level:
Natural vegetation must be retained wherever practicable and cleared areas must
be kept small and immediately revegetated to minimize the potential for instability
and future erosion.
. All excavations exceeding 1.0m or greater than 20 degrees must be supported by
adequately engineered retaining walls or battered at appropriate angles. Retaining
walls must be designed for a long term factor of safety of at least 1.5 and
constructed as soon as possible after cut or fill operation. Any fill placed behind
retaining walls must be engineered structural fill compacted to 95% SMDD or not
less than 70% Density index. Drainage must also be incorporated into the wall
design as well as behind the crest to intercept surface and subsurface water flows.
This surface water must be redirected into dedicated drainage areas.
.
Filling should be benched into the sloping ground surface and supported by
engineered retaining walls as needed. Fill batter slopes if appropriate should be no
steeper than 22 degrees or 2.5(H): 1 (V)and be over constructed and trimmed back
to ensure adequate compaction in the outer zones. Any placed fill should be
compacted to 95% SMDD or not less than 70% Density index and revegetated if
appropriate or protected against erosion immediately after construction. Fill heights
should be limited to less than 1.0m.
A surface drain system must be installed upslope of the proposed residence to
collect surface water flows from upslope areas. This water must then be discharged
into the stormwater system.
All lot runoff and roof water must be discharged into stormwater systems, not over
the ground surface. Alternatively roof water can be discharged into water tanks for
storage.
.
Slope sensitive residential design for the building must be adopted. Slope sensitive
residential design includes split level on-grade raft slabs, pole houses or framed
houses with suspended floors. It is understood that the house w be supported by
screw piers as recommended in the attached DEQ Soil Test Report.
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 3 Report MCU13/0106Related documentApplication case desk ↗
About this file
- File size
- 27.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.