Council Ref: MCU 16/0012
Our Ref: 7588

28 June, 2016

Noosa Regional Council
PO Box 141
Tewantin, QLD 4565

Via email: [email protected]

Attn Glen Conforti

Dear Glen

RE:      MCU – RESPONSE TO INFORMATION REQUEST – 5 GARNETT STREET, COOROY


We act on behalf of Creekgold Pty Ltd in relation to their development application and in response to
Council’s Information Request, dated 15 March, 2016 we now provide:

     Attachment A – Revised Proposal Plans, prepared by Verve Building Design and Concepts;
     Attachment B – Engineering Report and Stormwater Management Plan prepared by VTCE,
      consulting engineers;
     Attachment C – Traffic Report prepared by PTT;
     Attachment D – Noise Assessment Response prepared by MRG Environmental;
     Attachment E – Unity Water Advice Notice; and
     Attachment F - Landscape Plan

A response to each item of Council’s information request is included within the table below.




                                                 page 1
Log in to download the original file

MCU16_0012 Information Response letter.pdf · 203 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

Information Request       Response
Item

1 – street awning         The street awning has been extended to the east as far as the pedestrian
                          entry court to the building. The awning now spans the full width of the
                          retail façade. The awning will be designed to retain street trees.
2 – provide bicycle       Plans have been amended to include a 7x bike rack at the entry court to
spaces                    Garnet Street.

3 – equitable access      Equitable access is now provided from Wimmers Lane, via an entry to the
from Wimmers Lane         basement carpark at the north- western corner. Once within the
                          basement carpark, a marked pathway leads to the ramp to the ground
                          level and entrance to the retail area.

4 – public thoroughfare   The plans have been amended to include a 1.5m public thoroughfare
easement/ dedication      easement for the full length of the Wimmers Lane frontage.
to Wimmers Lane.

5 – street trees and      The alignment of drainage works has been amended to minimise impact
trees within property     on existing street trees on Garnet Street as well as the existing tree at the
                          south-east corner of the site- see revised plans within stormwater
                          management report. Should an arborist report still be considered
                          necessary by Council, it can be conditioned such that it is undertaken
                          prior to the issue of subsequent development approvals ie Op works ,
                          Building works.

6 – landscape area        The plans have been amended to show a total of 288 m2 (9.48%) of
                          landscaped open space. 25 car spaces are provided within the ground
                          level carpark. At least 6 canopy trees can be provided within the
                          landscaped area within the carpark area.

7 – council’s             Refer to the Stormwater Management Plan prepared by VTCE, consulting
stormwater                engineers at Attachment B

8 – basement              Refer to the Stormwater Management Plan prepared by VTCE, consulting
stormwater drainage       engineers at Attachment B

9 – levels and cross      Refer to amended plans and engineering report that identify the finished
sections                  levels for the footpath and access driveway with long cross section.

10 – crossover to         The crossover to Wimmers Lane will now only be directly accessed by
Wimmers Lane              service vehicles. The main pedestrian movement from Wimmers Lane will
                          be via the separate doorway at the north-west corner of the site.




                                              page 2

Page 3

                              Notwithstanding crossover detail for the driveway is provided within the
                              amended plans and engineering report.

 11/12 – delivery             Refer to the Traffic Report prepared by PTT; which identifies 2 loading bays at
 vehicles                     the Wimmers lane loading bay and a Van bay accessed from Garnet Street.
                              Turning templates are provided within the report.

 13/15– garnet st access      Refer to the Traffic Report prepared by PTT

 16/17 – manoeuvring in       Refer to the Traffic Report prepared by PTT.
 carpark

 18 – existing sewer          Refer to the service advice notice provided by Unity Water at Attachment E
 infrastructure

 19 – noise                   Refer to Noise Assessment Assessment prepared by MRG Environmental
                              at Attachment D

 20/23 – hydrology            Refer to Stormwater Management Plan prepared by VTCE, consulting engineers
                              at Attachment B.



We offer this response as a full response to Council’s information request and we now ask that Council
proceed with their assessment of the application.

Should you wish to discuss, please contact Nikki Christmas on (07) 3251 9480 or email:

[email protected]


Yours faithfully
Saunders Havill Group




Eddie Venturini
Principal Town Planning




                                                    page 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.