Engineering Report
Noosa on Weyba
3.1.2 Road 2
Cardno Sketch SK103 provides an indicative layout for the proposed Road 2 connection between precinct H
and Hollett Road (east). A detailed tree survey has been undertaken to enable selection of a suitable
alignment to minimise impact on the existing vegetation. The layout demonstrates that a significant portion of
the road footprint can be contained within the existing vegetation cleared area.
Prior to selection of the Road 2 alignment, an existing access driveway (located approximately 100m east of
the proposed alignment) was considered as an alternative Road 2 alignment. Following the ground truth,
flooding assessment and ecological assessment, it was determined that the alternative alignment would
have a greater impact on the environment.
The cross section of Road 2 has been modified to ensure there is minimal environmental disturbance. The
cross sections proposed, as detailed in Section 3.2 below, are adequate for safety and servicing the volume
of traffic predicted on this road, as well as minimising the footprint on the existing vegetation.
Localised widening has also been incorporated at the connection of Road 2 and Hollett road to allow for bus
turning movements.
3.2 Typical Cross Sections
Due to the environmental sensitivity of existing and proposed road alignments adjoining the conservation
and national park areas, it is proposed to utilise a combination of typical SCRC road cross-sections and
modified road cross-sections. Cardno Sketch SK101 indicates the typical cross-sections proposed for the
development.
Where sufficient area is available, the SCRC typical cross-sections have been utilised. In areas of ecological
sensitivity, modified typical sections have been utilised to reduce the extent of clearing. Road 2 and Hollett
Road (east) propose modified cross-sections incorporating a reduced pavement width of 7.4m. This
pavement width reduction will minimise the road footprint, whilst maintaining suitability for bus access. Three
modified typical sections are proposed, each section represents a difference scenario depending on the
existing contours, drainage requirements and cycle / pedestrian requirements.
Where applicable, the cross-sections maintain a 4m service corridor to one side, and 1 m electrical easement
to the opposite side.
It is also noted that Road 2 and Hollett Road are part of the trunk road network and therefore proposed to be
SCRC controlled roads. To achieve the optimum ecological and road design outcome, modified cross-
sections have been proposed for these roads. Although these roads are not strictly in accordance with
SCRC policy, we believe this is a practical and ecologically beneficial outcome for the project.
Through the preparation of subsequent development applications and detailed design, further refinement
and analysis of the cross-sections will be undertaken.
November 2012 Cardno 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.