Skip to the record
Accept no substitutions.

Council archive · source document

REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13/0095

of 9

Text shows just the words. Original shows the document exactly as it was published.

 No. 55 Lake Macdonald Drive Cooroy Stage 2 Short Duration Culvert
 Calculations for Access for Lots 5, 6, & 7.




Lot 7 Culvert: Catchment A (see Plan 1225-25).


Catchment Area A                     =
                                         1.653 ha


Q 1 00 rainfall event                FCIA     =
                                                        1/360 x 0.94 x 155 x 1.653                     0.67 m3/s


Cross Road culvert, 1 X 900x300 RCBC with outlet control.


Maximum HW                =
                              103.475(upstream side of dwy) 102.875(RCBC invert)
                                                                        -                              =
                                                                                                           0.6m


ke 0.4, A
     =
                 =
                     0.908 x 0.305        =
                                              0.277 sqm, L      =
                                                                     4.88m


de   =
         0.467(QIB)2/3        =
                                  0.467 X (0.51/0.9)2/3         =
                                                                    0.32m


TW       =
             xsect DIS of2/A (see attached PCDrain Calculation sheet)                        =
                                                                                                 0.232m


(de + 0)/2       =
                     (0.32 + 0.305)/2         =
                                                  0.313m


So ho is greater of 0.232 and 0.313                 =
                                                        0.313m


HW       =
             H + ho   -

                       LSo
0.6   =
          H + 0.313       -
                              0.03
H    =
         0.317


From Figure 9A-5 DTMR Road                         Drainage Manual, Q        =
                                                                                 0.51 m3/s


Q 1 00 weir flow                              =
                                                        Q 1 00 flow 0.67 m3Is      -
                                                                                     0.51 m3Is piped
                                                        0.16 m3/s


Weir Q100                          1.7LH3/2             B   =
                                                                6m
0.16                               1.7 x 6 x H312
H                                  (0.16I (1.7 x 6)i/3
                                   0.063m


Adopt weir capacity for a 0100 of 0.67 m3/s with 6m width, 0.063m upstream depth Hand
900x300 RCBC.


Note culvert more than adequate tor Q5 without overtopping as Q5                             =
                                                                                                  0.32 m3/s vs culvert
capacity of 0.51 m3Is.

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13_0095.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.