Skip to the record
The gold standard in government transparency.

Council archive · source document

REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13/0095

of 9

Text shows just the words. Original shows the document exactly as it was published.

  Lot 6 Culvert: Catchment A + B (see Plan 1225-25).


  Catchment Area A                  =
                                        1.755 ha


 Q 1 00 rainfall event              FCIA       =
                                                         1/360 x 0.94 x 155 x 1.755              =
                                                                                                           0.711 m3/s


 Cross Road culvert, 1 X 900x300 RCBC with outlet control.


 Maximum HW                =
                               1 02.883(upstream side of dwy)            -
                                                                              1 02.364(RCBC invert)        =
                                                                                                               0.519m


 ke=O.4, A        =
                      0.908 x 0.305        =
                                               0.277 sqm,L       =
                                                                      4.88m


 de   =
          0.467(QlBi/3         =
                                   OA67 X (OAI0.9i/3         =
                                                                 0.272m


 TW       =
              xsect D/S of2/C (see attached PCDrain Calculation sheet) = OA11m



 (de + D)/2       =
                      (0.272+ 0.305)/2          =
                                                    0.288m


 So ho is greater of 0.411 and 0.288                 =
                                                         0.411m


 HW       =
              H + ho   -

                           LSo
 0.519     =
               H + 0.411       -
                                   0.064
 H    =
          0.172


 From Figure 9A-5 DTMR Road                         Drainage Manual, Q         =
                                                                                   OAO m3/s


Q 1 00 weir flow                                         Q100 flow 0.711 m3/s         -
                                                                                        0.40 m3/s piped
                                                         0.311 m3/s


Weir QIOO                           1.7LH312             B   =
                                                                 3m
0.311                               l.7 x 3 x H312
H                                   (0.3111(1.7 x 3))2/3
                                    0.155m


Adopt weir capacity for a 0100 of 0.711 m3/s with 3m width, 0.155m upstream depth H and
900x300 RCBC.


Note culvert more than adequate for Q5 without overtopping as Q5                                =
                                                                                                    0.34 m3/s vs culvert
capacity of 0.40 m3/s.




X:\JOBS\CT Projects in progrcss\l225 30 lots lake MacDonald Drive\CorrespondencelStage 2 Correspondence\property access,
                                                                                                                           2
flooding calcs.doc

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13_0095.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.