Attachment 1 - Development Approval TPC1957
J.H. Hooton Pty. Ltd. - TPC 1957 - 19th November , 1987 - - Page 4
18.
a
The proposed layout of units is not approved due to conflict with
existing sewer mains. Should the’ applicant so desire Council would
consider relocation of the sewer mains within the site to suit. the
proposed unit layout. However the following requirements would
apply :~
(a) Full engineering design of the proposed sewer construction would
need to be submitted to Council for approval. Costs of checking
of designs by Council's sewerage consultants would need to be
borne by the applicant.
{b) The unit layout shovld not be finalised in relation to
preparation of building plans until consideration by Council of
the sewer relocation design and the required offsets from the
sewers to any buildings.
(c) All requirements concerning relocation of the sewerage facilities
and connection to existing mains shall be carried out to
Council's standards and requirements.
{d} Sewer relocation works shall be completed prior to building works
commencing in the vicinity of these sewers.
(e) No building approval will be issued until consideration and
approval of the sewer designs by Council's Shire Engineer.
(£) The sewer design shall be carried out so that access to ail
sewers within the site is available for Council for future
maintenance works. Council will not accept any buildings or
associated facilities such as swimming pools being construction
ever the sewers. The sewers should be located such that grassed
open areas or driveways are constructed over the sewer lines.
(g) Any existing connection points to the sewer to existing services
shall be closed off to the satisfaction of the Shire Engineer.
(h) Any sewers that are to remain in place after the development
construction shall be inspected by Council as to their condition
to allow any remedial works to be carried out prior to
construction works being carried out near the sewers.
(i) At the design stage the capacity of the existing sewers which
will serve the site shall be checked as to the adequacy of their
capacity to handle the design loading. Shouid any augmentation
be required to cater for the development this shall be carried
out at the full cost of the developer.
(j} A sewer connection point shall be provided for each unit and shop
in the proposed development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.