Original source · versioned page text
Attachment 1 - Development Approval TPC1957
J. H. 12. 13. 14. 15. 16. 17. Hooton Pty. Ltd. - TPC 1957 - 19th November, 1987 - Page 3 seo et wate Prior to finalisation of Building Plans, the applicant shall submit a detailed layout of the carparking and driveway areas. Such layout shall be in accordance with Council's Policies and standard drawings and shall specifically allow for a total of 4 loading bays on site. Roof and surface water is to be collected on site and discharged into Council's existing drainage system, in accordance with Council's Master Drainage Plan, to the satisfaction of the Shire Engineer. A full design of the proposed drainage system is to be submitted to Council for approval prior to issue of a building permit. The design shall include an assessment of the adequacy of Council's existing stormwater drainage at the discharge points of the internal system. The stormwater drainage system shall be designed so that suitable escape routes are available to accommodate stormwater in excess of the design storm frequency. The footpaths to the full frontages of the site are to be landscaped and upgraded to _ the satisfaction of the Shire Engineer. In this regard, a detailed landscaping plan of the proposed works is to be submitted for approval prior to the issue of a Building Permit. A minimum 1.2 m. wide footpath is to be provided on the Cockleshell frontage with the Thomas Street and Gympie Terrace frontages to be fully paved. Existing access crossovers not required to service the development are to be reinstated with kerb and channel to the satisfaction of the Shire Engineer. Such works shall include repairs to damaged sections of the existing kerb and channel as a result of the previous uses on the site. Prior to commencement of filling works, the applicants' ‘consultants shall submit, for approval by the Shire Engineer, an engineering study of the implications of the filling works in relation to the drainage petterns of adjoining lots. Such report shall include sufficient survey information, external to the site, to accurately determine the existing drainage flows, in addition to recommended drainage works on the perimeter of the site to prevent possible drainage problems on adjoining lots. All ‘drainage works necessitated by the development shall be at the full expense of the developer. Connection to Council's existing water supply reticulation system at the developer's expense to the standards and requirements of Council's Shire Engineer. The applicant's Hydravlic Consultant shall design the internal water reticulation system to provide a service to each unit in accordance with the Department of Local Government Guidelines. Any upgrading works required to Council's existing system to provide the required flow rates shall be at the Developer's full expense. .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.