Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works
[Figure 4). Stage 1 includes:
. Retain existing rock wall [maintain / upgrade as required)
.
Submerged channel closure [partial)
. Wall at end of Noosa River Spit
.
Groyne / Training Wall
.
Dredging for navigation (location to be detennined)
. Foreshore nourishment
. Removal of dead trees (marine plants) as required
.
Widening of access track
The submerged channel closure and groyne are to be constructed using sand-filled geotextile mega-containers.
The wall has been modified from the original design and is to be constructed of a combination of sand-filled geotextile mega-
containers and rock.
4. RELEVANT APPROVALS
The following approvals have been attained:
o Resource Entitlement ref: 2010/009024
o Development Approval ref: OPW 11/0116
o Prescribed tidal works ref: SPCC01881911
o Interfering wtth Marine Plants:2011 080083
o ERA 16 1(b) ref: SPCE01881811
o Registration Certificate ENRE02969911
o Clearing (Nature Conservation Act) ref: WICL09310811
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.