The DERM timeframe was primarily to ensure that construction proceeded while the river configuration was similar to that
during the design phases given the dominance of the middle channel and the link of the closure with the existing shoal. The
river configuration remains very similar and there seems to be no obvious sources of concern with extending the timeframe
to allow for completion of the works given the reason for the delay.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.