Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
PROPOSED CHANGE 2: DESIGN AMENDMENT
The ICM Report (2010) reviewed the advantages and disadvantages of the two preferred construction materials for the
works [Table 1].
Table 1 Ad vanta es & d.
Isadvanta es 0f rock & sand fll
-
I ed eotextl1e containers [Extract from ICM ,
2010)
Sand-filled Geotextile Containers Rock
Advantages Advantages
. Stable with suitable container sizes . Stable with adequate rock sizes
. Can be designed to allow for scour . Can be designed to allow for scour
. Flexible to accommodate additional scour if necessary . Flexible to accommodate additional scour if
.
Easily removed /modified /extended if necessary necessary. Easily topped up.
. Uses local materials [noneed to import materials] .
Easily extended
. Uses floating plant [noaccess issues] . Robust [nopotential for damage]
.
User-friendly . Voids may create habitat
. Substrate may provide
. Cost
Disadvantages Disadvantages
. Vulnerable to damage from vandalism /vessel impact .
Import of materials required
even with robust RPgeotextile. Higher maintenance. . If importing by truck, need for clearing and traffic
.
Replacement cost [25yearlifetime] issues along Hastings St
. Less user-friendly
. Cost
. More difficult to remove
Wtth regards to the preliminary design of the wall component at the end of Noosa River Spit, ICM (2010)concluded that:
"It was originally preferred to construct [the wall at the end of Noosa River Spit] using rock due to
concerns regarding the potential for damage. During stakeholder consultation, it becoame evident that
there were concerns regarding the use of rock, the difficulty of removal and the visual impact. At this
stage, the preferred option is the sand-filled mega-container wall, although if maintenance becomes an
ongoing issues, consideration may be given to rock armouring."
As such, the detailed design and approvals obtained for the works were for a sand-filled mega-container structure [Figure 4
& Figure 5].
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.